Continuous Integration / config-sls (pull_request) Successful in 22s
Continuous Integration / config-asf (pull_request) Successful in 24s
Continuous Integration / changes (pull_request) Successful in 3m3s
Continuous Integration / backend-build (pull_request) Successful in 2m10s
Continuous Integration / compile-sites (pull_request) Successful in 2m10s
Continuous Integration / frontend-prepare (pull_request) Successful in 1m35s
Continuous Integration / frontend-build (pull_request) Successful in 1m46s
Continuous Integration / frontend-test (pull_request) Successful in 2m16s
Continuous Integration / frontend-lint (pull_request) Successful in 30s
Continuous Integration / backend-test (pull_request) Successful in 3m1s
Continuous Integration / vulnerability-scan (pull_request) Successful in 6m8s
Continuous Integration / publish-sls-test (pull_request) Skipped
Continuous Integration / publish-sls-production (pull_request) Skipped
Continuous Integration / deploy-sls-test (pull_request) Skipped
Continuous Integration / deploy-sls-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / smoke-sls-test (pull_request) Skipped
Continuous Integration / smoke-asf-test (pull_request) Skipped
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
3.2 KiB
3.2 KiB
AI-DLC State Tracking
Project Information
- Feature Name: Contact Forms Module (contact messages API + admin, offerings category)
- Feature Slug: contact-forms-module
- Project Type: Brownfield
- Start Date: 2026-11-09
- Current Stage: CLOSED 2026-11-16 - all units built, Build and Test closed, Operations folded into the joint production checklist (
docs/release-checklist-productie.md) - Branch: feature/contact-forms-module (worktree ..SlpModularCms-contact-forms, from master d9cc539; main checkout stays on feature/identity-email-notifications — never switch it)
Workspace State
- Existing Code: Yes
- Reverse Engineering Needed: No full rerun (July 2026 artifacts exist in
_shared/; targeted code review of the touched areas instead — see requirements) - Workspace Root: K:\Development\Projects\SlpModularCms
Code Location Rules
- Application Code: Workspace root
src/(NEVER in aidlc-docs/) - Feature Documentation: aidlc-docs/features/contact-forms-module/ only
- Shared Artifacts: aidlc-docs/_shared/
Language Configuration
- Documentation Language: English
- Conversation Language: User Language (Dutch)
- Note: Inherited from the other features in this workspace.
Source Of Truth / Coordination
- Input contract:
K:\Development\SlpSoftware\Projects\SlpSoftware\aidlc-docs\features\redesign-modern-timetravel\inception\application-design\contact-api-contract.md(v0.3.1-draft, incl. § 10a and § 11) - Also: that feature's
inception\requirements\requirements.md(FR-7, FR-8, FR-13..FR-19, NFR-4, NFR-5) andapplication-design\* - Coordinator/approver of stages: session "Redesign - SLS" (approves within Bryan's decisions, otherwise asks Bryan). Stage status is reported to it.
- Do not touch files/behaviour the session "AndreaSlopFotografie" is still working on (AvailabilityMiddleware, rate limiter, host config, ForwardedHeaders, ASF settings) without coordination.
- No push/merge/PR without explicit instruction. No ASF addresses in code or committed config (env-only). No PII in logs.
Extension Configuration
| Extension | Enabled | Decided At |
|---|---|---|
| Security Baseline | Yes | Requirements Analysis |
| Property-Based Testing | Partial | Requirements Analysis |
Stage Progress
🔵 INCEPTION PHASE
- Workspace Detection (classification: Feature)
- Reverse Engineering (skipped by decision D10: targeted review in requirements)
- Requirements Analysis (awaiting approval)
- Workflow Planning (approved)
- Application Design - EXECUTE (minimal; awaiting approval)
- Units Generation - EXECUTE (awaiting approval)
🟢 CONSTRUCTION PHASE
- Functional Design - done per unit where needed
- NFR Requirements/Design - done where needed (U2, U3)
- Infrastructure Design - SKIP
- Code Generation - complete (CMS-U0 to U12, plus banners, schedule, SEO, CI, host injection and translation files, documented under their own features)
- Build and Test - closed 2026-11-16:
construction/build-and-test/build-and-test-summary.md
🟡 OPERATIONS PHASE
- Included in the joint production checklist (
docs/release-checklist-productie.md), not run as separate stages. The production release waits for the owner's explicit go.