Files
slp-modular-cms/aidlc-docs/features/cms-frontend/aidlc-state.md
SluijsensandClaude Sonnet 5.5 f9ee07da47
Continuous Integration / config-sls (pull_request) Successful in 22s
Continuous Integration / config-asf (pull_request) Successful in 24s
Continuous Integration / changes (pull_request) Successful in 3m3s
Continuous Integration / backend-build (pull_request) Successful in 2m10s
Continuous Integration / compile-sites (pull_request) Successful in 2m10s
Continuous Integration / frontend-prepare (pull_request) Successful in 1m35s
Continuous Integration / frontend-build (pull_request) Successful in 1m46s
Continuous Integration / frontend-test (pull_request) Successful in 2m16s
Continuous Integration / frontend-lint (pull_request) Successful in 30s
Continuous Integration / backend-test (pull_request) Successful in 3m1s
Continuous Integration / vulnerability-scan (pull_request) Successful in 6m8s
Continuous Integration / publish-sls-test (pull_request) Skipped
Continuous Integration / publish-sls-production (pull_request) Skipped
Continuous Integration / deploy-sls-test (pull_request) Skipped
Continuous Integration / deploy-sls-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / smoke-sls-test (pull_request) Skipped
Continuous Integration / smoke-asf-test (pull_request) Skipped
Docs: Build and Test en Operations van de features op deze branch gesloten; gezamenlijke productie-checklist (docs/release-checklist-productie.md)
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-11-16 11:41:01 +01:00

60 lines
3.0 KiB
Markdown

# AI-DLC State Tracking
## Project Information
- **Feature Name**: CMS Frontend
- **Feature Slug**: cms-frontend
- **Project Type**: Brownfield
- **Start Date**: 2026-06-16T20:27:00Z
- **Current Stage**: CLOSED 2026-11-16 - all units built; Build and Test closed (frontend suite in CI); Operations folded into the joint production checklist
- **Branch**: unknown
## Workspace State
- **Existing Code**: Yes (.NET API backend + example React app in ZIP)
- **Reverse Engineering Needed**: Yes (shared reverse engineering for backend; example app analyzed)
- **Workspace Root**: K:\Development\Projects\SlpModularCms
## Code Location Rules
- **Application Code**: frontend/ (new Vite + React app; kept outside src/ to keep the .NET solution clean — see unit-1-code-generation-plan.md)
- **Feature Documentation**: aidlc-docs/features/cms-frontend/ only
- **Shared Artifacts**: aidlc-docs/_shared/
- **Structure patterns**: See code-generation.md Critical Rules
## Language Configuration
- **Documentation Language**: English
- **Conversation Language**: Dutch (nl)
## Extension Configuration
| Extension | Enabled | Decided At |
|---|---|---|
| Security Baseline | Yes | Requirements Analysis |
| Property-Based Testing | No | Requirements Analysis |
## Execution Plan Summary
- **Total Units**: 6
- **Stages to Execute**: Application Design, Units Generation, Functional Design (per unit), NFR Requirements (Unit 1), NFR Design (Unit 1), Code Generation (per unit), Build and Test
- **Stages to Skip**: Infrastructure Design (no cloud infra; static SPA)
## Stage Progress
### 🔵 INCEPTION PHASE
- [x] Workspace Detection — Completed 2026-06-16T20:28:00Z
- [x] Reverse Engineering (shared) — Completed 2026-06-16T20:32:00Z
- [x] Requirements Analysis — Completed 2026-06-16T21:00:00Z
- [x] User Stories — Completed 2026-06-16T21:05:00Z
- [x] Workflow Planning — Completed 2026-06-16T21:15:00Z
- [x] Application Design — Completed 2026-06-16T22:00:00Z
- [x] Units Generation — Completed 2026-06-16T22:20:00Z
### 🟢 CONSTRUCTION PHASE (per unit)
- [x] Unit 0 — Backend Prerequisites (CORS + httpOnly cookie) — COMPLETED 2026-06-19T11:45:00Z
- [x] Unit 1 — Project Scaffold & Infrastructure — COMPLETED 2026-06-20T17:30:00Z
- [x] Unit 2 — Authentication Pages — COMPLETED 2026-06-22 (29/29 tests pass, build ✅, runtime bugs fixed)
- [x] Unit 3 — Layout & Navigation — COMPLETED 2026-06-22 (all commits merged, tests pass)
- [x] Unit 4 — Dashboard — COMPLETED 2026-06-22 (55/55 tests pass, build ✅)
- [x] Unit 5 — User Management — COMPLETED 2026-06-22 (all 21 steps done, tests written)
- [x] Unit 6 — Profile, Settings & CMS Placeholder — COMPLETED 2026-06-22 (all 25 steps done, tests written)
- [x] Build and Test — Closed 2026-11-16 (frontend vitest 531/531, lint and build run in CI as `frontend-test`; the admin has been in use on the test hosts)
### 🟡 OPERATIONS PHASE
- [x] Operations — Included in the joint production checklist (`docs/release-checklist-productie.md`)