Docs: Hero afgesloten (Build and Test, release-checklist 4b, aannamelijst met besluiten van 2026-11-17)
Continuous Integration / config-sls (pull_request) Successful in 7s
Continuous Integration / config-asf (pull_request) Successful in 7s
Continuous Integration / changes (pull_request) Successful in 14s
Continuous Integration / frontend-prepare (pull_request) Successful in 26s
Continuous Integration / backend-build (pull_request) Successful in 2m0s
Continuous Integration / vulnerability-scan (pull_request) Successful in 2m3s
Continuous Integration / frontend-build (pull_request) Successful in 42s
Continuous Integration / frontend-lint (pull_request) Successful in 36s
Continuous Integration / frontend-test (pull_request) Successful in 2m23s
Continuous Integration / compile-sites (pull_request) Successful in 8m2s
Continuous Integration / backend-test (pull_request) Successful in 2m19s
Continuous Integration / publish-sls-test (pull_request) Skipped
Continuous Integration / publish-sls-production (pull_request) Skipped
Continuous Integration / deploy-sls-test (pull_request) Skipped
Continuous Integration / deploy-sls-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / smoke-sls-test (pull_request) Skipped
Continuous Integration / smoke-asf-test (pull_request) Skipped

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-17 10:30:18 +01:00
co-authored by Claude Sonnet 5.5
parent bccc45c267
commit 0bea72202b
5 changed files with 46 additions and 4 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: hero-module
- **Project Type**: Brownfield
- **Start Date**: 2026-11-16
- **Current Stage**: CONSTRUCTION - Build and Test (first test deploy next)
- **Current Stage**: CLOSED 2026-11-17 (Build and Test closed; Operations in the joint production checklist; merge to master by SLS-Main after green PR checks)
- **Branch**: feature/hero-module (worktree K:\Development\Projects\SlpModularCms-contact-forms, from master b2cacfe)
## Workspace State
@@ -54,6 +54,6 @@
- [x] NFR Design (construction/nfr-design/)
- [x] Infrastructure Design (media directory; construction/infrastructure-design/)
- [x] Code Generation - H0 to H6 built (LCP measurement on the test hosts is part of Build and Test)
- [ ] Build and Test - EXECUTE
- [x] Build and Test - closed 2026-11-17 (construction/build-and-test/build-and-test-summary.md)
### 🟡 OPERATIONS PHASE
- [ ] SKIP (Q19 = B; points go into the joint production checklist)
- [x] SKIP (Q19 = B; points are in section 4b of docs/release-checklist-productie.md)