Continuous Integration / check (pull_request) Successful in 2m25s
Continuous Integration / build-test (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 9m2s
Continuous Integration / deploy-production (pull_request) Skipped
The form is closed unless the build sets VITE_CONTACT_FORM_ENABLED=true (only
the test build does), so d449e76 no longer has to be undone before the merge.
Status files of contact-form-cms, asf-packages-cms, asf-cms-host-injection and
asf-translation-files are closed; Build and Test summary added.
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
23 lines
1.4 KiB
Markdown
23 lines
1.4 KiB
Markdown
# AI-DLC State Tracking
|
|
|
|
## Project Information
|
|
|
|
- **Feature Name**: CMS host injects CMS data into the prerendered ASF pages
|
|
- **Feature Slug**: asf-cms-host-injection
|
|
- **Project Type**: Brownfield (cross-repo: this repo delivers markers, contract and golden files; SlpModularCms owns the injector)
|
|
- **Start Date**: 2026-11-15
|
|
- **Current Stage**: COMPLETE on the ASF side (closed 2026-11-16); delivered on branch feature/asf-packages-cms together with [asf-packages-cms](../asf-packages-cms/aidlc-state.md). Host side by SMC (CMS PR).
|
|
- **Plan**: [plan.md](plan.md) (approach agreed by Bryan, 2026-11-15)
|
|
|
|
## Language Configuration
|
|
|
|
- **Documentation Language**: English
|
|
- **Conversation Language**: User Language (Dutch)
|
|
|
|
## Stage Progress
|
|
|
|
- [x] INCEPTION - Requirements and plan (plan.md; decisions (a) brief look change accepted, (b) host writes the list HTML)
|
|
- [x] CONSTRUCTION - Code Generation: markers and regions, data block, hydration from the block, JSON-LD price, inline price, own address replacement, stand-in host in the preview server, golden files in `web/contract/host-injection/`, e2e tests, deployment-check normalisation
|
|
- [x] CONSTRUCTION - Build and Test: see the asf-packages-cms summary; end-to-end on ASF-test: SMC still to confirm (not part of closing the ASF side)
|
|
- [x] OPERATIONS - part of the joint production checklist (production needs IIS pass-through to the CMS host, separate feature)
|