Files
SluijsensandClaude Sonnet 5.5 7a5e713b69
Continuous Integration / check (pull_request) Successful in 1m45s
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 8m44s
Continuous Integration / deploy-production (pull_request) Skipped
Adds the AI-DLC documents of the testimonials redesign
Requirements, execution plan, functional design, code summaries, build and test results and the audit log; the reverse-engineering notes and the feature registry are updated.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-11-06 01:24:15 +01:00

14 lines
1.5 KiB
Markdown

# Functional Design Plan: testimonials (unit 2)
Only the checklist. The questions are in `testimonials-fd-questions.md`.
- [x] **Step 1: Analyse unit context.** Requirements FR-TR-01..04 and 06..14, NFR-TR-01..06, the approved canvas, and the existing design of the section (`homepage-sections/construction/lieve-woorden/functional-design`, BR-REV-01..11, BR-LZY-02).
- [x] **Step 2: Questions.** Four layout and behaviour questions the canvas does not settle (tablet layout, card height, sand block, out-of-range crop values).
- [x] **Step 3: Collect and check the answers.**
- [x] **Step 4: Domain entities.** `Testimonial` with the optional `imagePosition`; the normalised position; the counter text; invariants. File: `domain-entities.md`.
- [x] **Step 5: Business rules.** Updated rule table (what replaces BR-REV-04, 06, 09, 11; new rules for the counter, the crop and the card) and decision flowcharts. File: `business-rules.md`.
- [x] **Step 6: Business logic model.** Navigation (button, key, swipe, loop), announcement, placeholder swap, and the two pure helpers with their **testable properties (PBT-01)**. File: `business-logic-model.md`.
- [x] **Step 7: Frontend components.** Component hierarchy, layout geometry for desktop, tablet and phone, props, equal height, slide animation on Chakra's carousel, placeholder height, accessibility, test ids. File: `frontend-components.md`.
- [x] **Step 8: Extension compliance** for this stage (Security Baseline, PBT-01).
- [ ] **Step 9: Completion message and approval.** (message presented; awaiting approval)