TEST_DEPLOY_PATH, TEST_HEALTH_URL, PROD_HEALTH_URL, PROD_DEPLOY_PATH and PROD_HOST_* replace the old names (decision of Bryan, 2026-11-18). The test build no longer fetches packages (the host injects them) and ASF_TEST_SERVED_BY_CMS is gone: test is always served by the CMS host. PI_MAIN_* stay until the TEST_HOST_* secrets and the SSH key exist. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
48 lines
4.0 KiB
Markdown
48 lines
4.0 KiB
Markdown
# Go-live checklist
|
|
|
|
What must be true before the CMS-driven parts of the site go to production. Bryan gives the explicit go for each; nothing here is done by merging alone. The per-feature record is in `aidlc-docs/features/contact-form-cms/operations/production-readiness-checklist.md` and `aidlc-docs/features/asf-packages-cms/`.
|
|
|
|
## Before merging to master
|
|
|
|
- [x] The TEST ONLY commit `d449e76` is undone: the form is closed unless the build sets `VITE_CONTACT_FORM_ENABLED=true` (only the test build does; [deploy-and-ci.md](deploy-and-ci.md)).
|
|
- [ ] Merge: the CMS PR first, then `feature/asf-packages-cms` (which carries the contact-form commits).
|
|
|
|
## Packages and banners
|
|
|
|
- [ ] Production hosting in place with the CMS host as the one entry of the website: IIS passes ALL requests to the CMS host (not only `/api/v1/*`) and serves no static files itself; the prerendered `dist/` is deployed to the CMS host ([cms-integration.md](cms-integration.md), "Hosting"). The generated IIS config and the production upload script are updated for this. Without it production keeps the committed snapshot and the console shows a 404 per page view for the API.
|
|
- [ ] `web/src/content/offerings.snapshot.json` holds the real, current packages (production builds use it).
|
|
- [ ] The production CMS holds the real packages. The test CMS prices must never end up in the production artifact (no build fetches packages from a CMS any more).
|
|
|
|
## Hero
|
|
|
|
- [ ] The hero module is on `master` and the CMS host of the target environment has the hero module and the injection (`HERO-HTML`, `HERO-PRELOAD`, `hero` in the data block).
|
|
- [ ] ASF-test: the hero is seeded (Bryan runs the seed, admin password) and the home page checked on phone and desktop; the assumption list `aidlc-docs/features/hero-module/assumptions-and-open-questions.md` is read.
|
|
- [ ] Production: ASF-production is served by the CMS host (the IIS pipeline, later) and holds the real hero. Until then production shows the baked hero in `src/content/heroContent.ts`; check that it is the one you want.
|
|
|
|
## Contact form
|
|
|
|
- [ ] All conditions in the contact-form production readiness checklist (server module, recipient, sender, retention 1 year / 30 days spam, proxies, CSP `frame-src`, a real mail from the production host).
|
|
- [ ] Captcha decision: off at go-live until a paid Friendly Captcha plan exists; the EU endpoint changes the CSP and the privacy text.
|
|
- [ ] Then, with Bryan's explicit go (after the captcha decision), the production build gets `VITE_CONTACT_FORM_ENABLED=true`, in its own reviewed change. Until then the production artifact has the form closed.
|
|
- [ ] Operations for the form are part of this joint production checklist (no separate steps; the rebuild-trigger question lapses because the CMS host shows changes at once, NFR-10).
|
|
|
|
## Privacy statement (page `/privacyverklaring`)
|
|
|
|
The statement is a separate feature on branch `feature/privacy-statement` (a draft; nothing of it is live). It may only go live when:
|
|
|
|
- [ ] Bryan has approved the text.
|
|
- [ ] The hosting and mail provider (MijnHostingPartner) is confirmed as processor, a processing agreement (verwerkersovereenkomst) exists, and data and mail processing in the Netherlands is confirmed.
|
|
- [ ] The response time ("binnen een maand") is confirmed.
|
|
- [ ] The captcha paragraph matches the captcha decision above (the paragraph is hidden while captcha is off).
|
|
- [ ] No `[OPEN:` marker is left in a visible section (`unresolvedPlaceholders()` in `privacyContent.ts` returns an empty list).
|
|
- [ ] The retention periods in the statement match the server settings (1 year, 30 days for spam).
|
|
|
|
The contact form must not go live before the statement does.
|
|
|
|
## Other open items
|
|
|
|
- ASF production hosting: CMS host behind IIS pass-through (separate feature, see above).
|
|
- Host injection of CMS data into the prerendered pages (plan: `aidlc-docs/features/asf-cms-host-injection/plan.md`, after the current merges).
|
|
- First ASF administrator and removal of the setup token (CMS).
|
|
- Messages created by the Playwright test run in the ASF test CMS are archived by Bryan.
|