Logs the WIP pull request in the audit
Continuous Integration / deploy-test (pull_request) Canceled after 0s
Continuous Integration / lighthouse (pull_request) Canceled after 0s
Continuous Integration / deploy-production (pull_request) Canceled after 0s
Continuous Integration / check (pull_request) Canceled after 6m38s

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-31 00:34:26 +01:00
co-authored by Claude Opus 5.5
parent 33c62f8b34
commit 68842e4982
@@ -421,3 +421,10 @@
**AI Response**: Unit-3 code summary corrected (Steps 17–18 passed, not pending); content-pending.md corrected (branch already contains master 1416497). active-features status "⏸️ Waiting for content" instead of "✅ Complete" because the merge is blocked on content (CON-ST-03). Committing, pushing and opening a WIP PR to master; the WIP title keeps it from being merged before the content is final.
---
## Build and Test — WIP pull request opened
**Timestamp**: 2026-10-30T23:34:26Z
**AI Response**: Opened PR #13 "WIP: Adds the shoot-type pages" (feature/shoot-type-pages → master). The WIP prefix blocks merging until the content in content-pending.md is final; remove it then.
**Context**: CONSTRUCTION - Build and Test complete, waiting for content
---