Host setup checklist, real domains and ports, the database backup script the deploy workflow only ever invokes, and a rollback plan. Also drafted the FTPS switch procedure for whenever production moves off the Pi, with a note that shared hosting is likely IIS-based - that's a bigger change than swapping the transport.