Units of Work - andreaslop-site-hosting
Terminology: both units are changes to the same deployable codebase ("Unit of Work" = planning/delivery slice), delivered on one branch, commits per unit.
U1 core-site-hosting
- Scope: C2 WebsiteMode, C3 prerendered site serving (resolver, middleware, options, compression), C4 StrictSite policy and site origin lists, pipeline order, docs (
README.md,WEBSITE_WORKSPACE.md). - Code locations:
src/SlpModularCms.Core/Hosting/**(+src/SlpModularCms.Core.Tests/**). - Not touched:
Api,Api.SlpSoftwaresources (only regression-tested), Identity, frontend, CI. - Construction stages: Functional Design, NFR Requirements, NFR Design, Code Generation (Infrastructure Design skipped).
- Done when: requirements acceptance (U1) met, per-unit build and tests green,
Api/Api.SlpSoftwareregression green, hand-back note sent, requester's "go" received. - Commit(s): on
feature/andreaslop-site-hosting; no push.
U2 andreaslop-client
- Scope: C1 client project and solution entry (Clients), C5 theme and build variables, C7 setup token (Identity + setup page), C6 CI/CD, Pi manual-step list, test deploy (with Bryan's go, test only).
- Code locations:
src/SlpModularCms.Api.AndreaSlopFotografie/**,src/SlpModularCms.Modules.Identity/**(+ tests),frontend/**,.gitea/workflows/**,SlpModularCms.sln, docs. - Construction stages: NFR Requirements, NFR Design, Infrastructure Design, Code Generation (Functional Design skipped).
- Starts: only after U1 hand-back and the requester's "go".
- Done when: requirements acceptance (U2) met, hand-back note sent.
- Commit(s): same branch; one PR after U2 when Bryan asks.
Cross-unit
Build and Test (all units), then Operations (Deployment Setup, Monitoring Setup, Production Readiness for the test environment).