Files
slp-modular-cms/aidlc-docs/features/identity-email-notifications/aidlc-state.md
T

3.1 KiB

AI-DLC State Tracking

Project Information

  • Feature Name: E-mail notifications for identity (invitation, new activation link, password reset)
  • Feature Slug: identity-email-notifications
  • Project Type: Brownfield
  • Start Date: 2026-11-08
  • Current Stage: CONSTRUCTION - U1 and U2 code generated and tested; requirements and design approved by Bryan (relayed), D1 and D2 decided
  • Branch: feature/identity-email-notifications (branched from feature/andreaslop-site-hosting at e9feb37; own branch, not merged anywhere)
  • Request Type: Feature (Bryan chose real e-mail over a workaround button; relayed by session "CMS & API")

Workspace State

  • Existing Code: Yes
  • Reverse Engineering Needed: No - reuse aidlc-docs/_shared/reverse-engineering/
  • Workspace Root: K:\Development\Projects\SlpModularCms

Code Location Rules

  • Application Code: Workspace root (NEVER in aidlc-docs/)
  • Feature Documentation: aidlc-docs/features/identity-email-notifications/ only

Language Configuration

  • Documentation Language: English
  • Conversation Language: User Language (Dutch)
  • Note: Inherited from the other features in this workspace.

External Requester (hand-off)

  • Session: "CMS & API", relays Bryan's decisions. Questions for Bryan go through that session. No implementation before the answers are in.
  • Reference implementation (read-only): K:\Development\Projects\SimpleDeckApp (MailKit/MimeKit SmtpEmailSender, IEmailSender.SendAsync(to, subject, htmlBody, ct), EmailOptions section "Email").

Extension Configuration

Extension Enabled Decided At
Security Baseline Yes (Q15 A) Requirements Analysis
Property-Based Testing Yes - partial PBT-02,03,07,08,09 (Q16 B) Requirements Analysis

Operations Configuration

  • Include Operations Phase: Yes (Q17 A)
  • Decided At: Requirements Analysis

Stage Progress

INCEPTION

  • Workspace Detection - Complete
  • Requirements Analysis - P1-P5 decided by Bryan (relayed); requirements.md updated
  • [~] User Stories - skipped (see execution plan)
  • Workflow Planning - approved (relayed)
  • Application Design - approved (relayed); D1 picker in invite dialog, D2 stamp in access token (U3)
  • Units Generation - U1 mail-foundation, U2 identity-mail-flows, U3 password-reset

CONSTRUCTION

  • U1 mail-foundation - Infrastructure Design (construction/mail-foundation/infrastructure-design/infrastructure-design.md), Code Generation done, build and tests green (see code-summary.md); hand-back pending
  • U2 identity-mail-flows - Code Generation done, build and tests green (see construction/identity-mail-flows/code/code-summary.md); includes D1 and D2; hand-back pending
  • U3 password-reset - Code Generation done, build and tests green (see construction/password-reset/code/code-summary.md); hand-back pending (D2, the security stamp in the access token, was built in U2)
  • [~] Build and Test - summary written (construction/build-and-test/build-and-test-summary.md); manual real test mail on ASF test pending
  • Operations (deployment, monitoring, production readiness incl. SPF/DKIM alignment checklist)