2.7 KiB
2.7 KiB
AI-DLC State Tracking
Project Information
- Feature Name: E-mail notifications for identity (invitation, new activation link, password reset)
- Feature Slug: identity-email-notifications
- Project Type: Brownfield
- Start Date: 2026-11-08
- Current Stage: CONSTRUCTION - U1 mail-foundation code generated and tested (local commits, not pushed); requirements and design approved by Bryan (relayed), D1 and D2 decided
- Branch: feature/identity-email-notifications (branched from feature/andreaslop-site-hosting at e9feb37; own branch, not merged anywhere)
- Request Type: Feature (Bryan chose real e-mail over a workaround button; relayed by session "CMS & API")
Workspace State
- Existing Code: Yes
- Reverse Engineering Needed: No - reuse aidlc-docs/_shared/reverse-engineering/
- Workspace Root: K:\Development\Projects\SlpModularCms
Code Location Rules
- Application Code: Workspace root (NEVER in aidlc-docs/)
- Feature Documentation: aidlc-docs/features/identity-email-notifications/ only
Language Configuration
- Documentation Language: English
- Conversation Language: User Language (Dutch)
- Note: Inherited from the other features in this workspace.
External Requester (hand-off)
- Session: "CMS & API", relays Bryan's decisions. Questions for Bryan go through that session. No implementation before the answers are in.
- Reference implementation (read-only): K:\Development\Projects\SimpleDeckApp (MailKit/MimeKit
SmtpEmailSender,IEmailSender.SendAsync(to, subject, htmlBody, ct),EmailOptionssection "Email").
Extension Configuration
| Extension | Enabled | Decided At |
|---|---|---|
| Security Baseline | Yes (Q15 A) | Requirements Analysis |
| Property-Based Testing | Yes - partial PBT-02,03,07,08,09 (Q16 B) | Requirements Analysis |
Operations Configuration
- Include Operations Phase: Yes (Q17 A)
- Decided At: Requirements Analysis
Stage Progress
INCEPTION
- Workspace Detection - Complete
- Requirements Analysis - P1-P5 decided by Bryan (relayed); requirements.md updated
- [~] User Stories - skipped (see execution plan)
- Workflow Planning - approved (relayed)
- Application Design - approved (relayed); D1 picker in invite dialog, D2 stamp in access token (U3)
- Units Generation - U1 mail-foundation, U2 identity-mail-flows, U3 password-reset
CONSTRUCTION
- U1 mail-foundation - Infrastructure Design (construction/mail-foundation/infrastructure-design/infrastructure-design.md), Code Generation done, build and tests green (see code-summary.md); hand-back pending
- U2 identity-mail-flows
- U3 password-reset (includes D2: security stamp in the access token)