Sluijsens cf80f827ae Deployment setup - the parts the workflow deliberately left out
Host setup checklist, real domains and ports, the database backup
script the deploy workflow only ever invokes, and a rollback plan.
Also drafted the FTPS switch procedure for whenever production moves
off the Pi, with a note that shared hosting is likely IIS-based -
that's a bigger change than swapping the transport.
2026-07-28 19:07:26 +02:00

4.7 KiB
Raw Blame History

Deployment Setup Plan

Context already established (not re-asked)

The deployment mechanism was already decided and built during Construction — this stage is about producing the operational documentation around it, not re-deciding the method:

  • Method: Gitea Actions CI/CD (continuous_integration.yamldeploy-scp.yaml), built in U5/U6
  • Target: a single Raspberry Pi (linux-arm64), test and production on the same host, split by directory only (infrastructure-design.md § 1)
  • Transport: SSH/SCP, sshpass + plain shell steps (D-05)
  • Release strategy: atomic release-directory switch, 2 releases retained, systemd --user services, no sudo (infrastructure-design.md §§ 23)
  • Rollback mechanism: re-point the current symlink to the previous release and restart the service — already fully specified, this stage just needs to write it up as a runnable procedure
  • Approval gate for production: the workflow_dispatch + deploy_production flag itself is the approval gate (D-09) — no additional gate is needed

Question 1: Include Deployment Setup?

Given all of the above was purpose-built in Construction specifically to be deployed, declining this stage would leave the pipeline built but undocumented for actual first use. Recommended: A.

A) Yes — produce the deployment documentation (Recommended) B) No — deployment is handled elsewhere or not needed C) Not sure — suggest an approach and I'll decide

X) Other (please describe after Answer: tag below)

Question 2: Deployment Method

Confirms the method already built — asked per the mandatory format, not because it's genuinely open.

A) CI/CD pipeline (already built: Gitea Actions, this is a confirmation, not a new choice) (Recommended) B) Something else entirely — describe below

X) Other (please describe after Answer: tag below)


The remaining questions are the genuinely open items — real host facts that only you know, which infrastructure-design.md deliberately left for this stage.

Question 3: Real Domains

HEALTH_CHECK_URL_TEST / _PRODUCTION and the nginx routing (infrastructure-design.md § 1) need real hostnames to write concrete instructions. What should the deployment instructions use?

A) I'll provide the real domains now — describe them after Answer: below (e.g. test.example.nl, example.nl) B) Use placeholders (<test-domain>, <production-domain>) in the generated instructions; I'll fill them in myself when configuring Gitea variables

X) Other (please describe after Answer: tag below)

Answer:A, production: slpsoftware.nl, test: test.slpsoftware.nl

Question 4: Database Backup Script

deploy-scp.yaml (U6) invokes ~/scripts/backup-slpmodularcms-db.sh on the host but does not create it — it's host-side, deliberately kept out of the workflow so no DB credentials ever touch Gitea. Should this stage draft that script's content for you to place on the Pi?

A) Yes, draft a sqlcmd/BACKUP DATABASE script now, parameterized by environment (Recommended) B) No, I'll write the backup script myself — just document what it must accept/do (arguments, exit-code contract, where the workflow expects it) C) Not applicable yet — document it as a TODO, I'll come back to this before the first production deploy

X) Other (please describe after Answer: tag below)

Question 5: FTPS Switch Documentation Depth

D-02 requires the workflow to allow adding FTPS later without restructuring (already satisfied by the transport input in deploy-scp.yaml) — but how much should the documentation say about actually switching to it when production eventually moves to shared hosting?

A) Brief note only: confirm the extension point exists in the workflow, don't draft the FTPS steps themselves (Recommended — shared hosting isn't happening yet, OPEN-04) B) Draft a full FTPS switch procedure now, even though it won't be used until shared hosting happens

X) Other (please describe after Answer: tag below)

Question 6: One-Time Host Setup Checklist

Several one-time, host-side prerequisites were identified during Infrastructure Design and must be documented somewhere before the first real deploy can succeed: loginctl enable-linger (INFRA-U6-01), creating the systemd --user unit files, creating the releases/shared/current directory skeleton, and the Gitea secrets/variables from infrastructure-design.md § 6. Confirm this belongs in deployment-instructions.md?

A) Yes, include a full one-time host-setup checklist in the deployment instructions (Recommended) B) No, I'll assemble the host setup myself from the Infrastructure Design doc directly

X) Other (please describe after Answer: tag below)