AI-DLC State Tracking
Project Information
- Project Name: SlpModularCms.Api
- Project Type: Greenfield (minimale scaffolding aanwezig, geen business logic)
- Start Date: 2026-06-07T22:43:00Z
- Current Stage: CONSTRUCTION PHASE - VOLTOOID
Workspace State
- Existing Code: Ja (alleen standaard ASP.NET Core scaffolding: Program.cs, csproj)
- Programming Languages: C# (.NET 10)
- Build System: .NET SDK / csproj
- Project Structure: Enkel project (monolith, nog leeg)
- Reverse Engineering Needed: Nee (geen business logic aanwezig)
- Workspace Root: K:\Development\Projects\SlpModularCms
Code Location Rules
- Application Code: Workspace root (NEVER in aidlc-docs/)
- Documentation: aidlc-docs/ only
- Structure patterns: Zie code-generation.md Critical Rules
Extension Configuration
| Extension | Ingeschakeld | Beslist bij |
|---|---|---|
| Security Baseline | Ja | Requirements Analysis |
| Property-Based Testing | Gedeeltelijk | Requirements Analysis |
Execution Plan Summary
- Total Stages: 14
- Stages to Execute: Application Design, Units Generation, Functional Design, NFR Requirements, NFR Design, Code Generation, Build and Test.
- Stages to Skip: Reverse Engineering (Greenfield), Infrastructure Design (Standard setup).
Stage Progress
INCEPTION PHASE
- Workspace Detection — VOLTOOID (2026-06-07T22:43:00Z)
- Requirements Analysis — VOLTOOID (2026-06-07T22:43:00Z)
- User Stories — VOLTOOID (2026-06-08T23:10:00Z)
- Workflow Planning — VOLTOOID (2026-06-10T21:14:00Z)
- Application Design — VOLTOOID (2026-06-10T22:05:00Z)
- Units Generation — VOLTOOID (2026-06-10T22:30:00Z)
CONSTRUCTION PHASE
Unit 01: Core Base
- Functional Design — VOLTOOID (2026-06-10T22:55:00Z)
- NFR Requirements — VOLTOOID (2026-06-11T23:42:00Z)
- NFR Design — VOLTOOID (2026-06-11T23:48:00Z)
- Code Generation — VOLTOOID (2026-06-11T23:55:00Z)
- Build and Test — VOLTOOID (2026-06-11T23:55:00Z)
Unit 02: Identity & RBAC
- Functional Design — VOLTOOID (2026-06-12T01:05:00Z)
- NFR Requirements — VOLTOOID (2026-06-12T01:05:00Z)
- NFR Design — VOLTOOID (2026-06-12T01:05:00Z)
- Code Generation — VOLTOOID (2026-06-12T01:10:00Z)
- Build and Test — VOLTOOID (2026-06-12T01:10:00Z)
Unit 03: Availability Module
- Functional Design — VOLTOOID (2026-06-12T01:15:00Z)
- NFR Requirements — VOLTOOID (2026-06-12T01:15:00Z)
- NFR Design — VOLTOOID (2026-06-12T01:15:00Z)
- Code Generation — VOLTOOID (2026-06-12T01:20:00Z)
- Build and Test — VOLTOOID (2026-06-12T01:20:00Z)
Unit 04: API Shell & Integration
- Functional Design — VOLTOOID (2026-06-12T01:25:00Z)
- NFR Requirements — VOLTOOID (2026-06-12T01:25:00Z)
- NFR Design — VOLTOOID (2026-06-12T01:25:00Z)
- Code Generation — VOLTOOID (2026-06-12T01:35:00Z)
- Build and Test — VOLTOOID (2026-06-12T01:35:00Z)
OPERATIONS PHASE
- Operations — PLACEHOLDER