Files
slp-modular-cms/aidlc-docs/features/hero-module/aidlc-state.md
SluijsensandClaude Sonnet 5.5 0bea72202b
Continuous Integration / config-sls (pull_request) Successful in 7s
Continuous Integration / config-asf (pull_request) Successful in 7s
Continuous Integration / changes (pull_request) Successful in 14s
Continuous Integration / frontend-prepare (pull_request) Successful in 26s
Continuous Integration / backend-build (pull_request) Successful in 2m0s
Continuous Integration / vulnerability-scan (pull_request) Successful in 2m3s
Continuous Integration / frontend-build (pull_request) Successful in 42s
Continuous Integration / frontend-lint (pull_request) Successful in 36s
Continuous Integration / frontend-test (pull_request) Successful in 2m23s
Continuous Integration / compile-sites (pull_request) Successful in 8m2s
Continuous Integration / backend-test (pull_request) Successful in 2m19s
Continuous Integration / publish-sls-test (pull_request) Skipped
Continuous Integration / publish-sls-production (pull_request) Skipped
Continuous Integration / deploy-sls-test (pull_request) Skipped
Continuous Integration / deploy-sls-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / smoke-sls-test (pull_request) Skipped
Continuous Integration / smoke-asf-test (pull_request) Skipped
Docs: Hero afgesloten (Build and Test, release-checklist 4b, aannamelijst met besluiten van 2026-11-17)
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-11-17 10:30:18 +01:00

3.6 KiB

AI-DLC State Tracking

Project Information

  • Feature Name: Hero module (manageable hero for SLP Software and Andrea Slop Fotografie)
  • Feature Slug: hero-module
  • Project Type: Brownfield
  • Start Date: 2026-11-16
  • Current Stage: CLOSED 2026-11-17 (Build and Test closed; Operations in the joint production checklist; merge to master by SLS-Main after green PR checks)
  • Branch: feature/hero-module (worktree K:\Development\Projects\SlpModularCms-contact-forms, from master b2cacfe)

Workspace State

  • Existing Code: Yes
  • Reverse Engineering Needed: No full rerun (artifacts exist in _shared/reverse-engineering/; targeted review of Offerings banners, host injection and website hosting instead)
  • Workspace Root: K:\Development\Projects\SlpModularCms

Code Location Rules

  • Application Code: Workspace root src/ and frontend/ (NEVER in aidlc-docs/)
  • Feature Documentation: aidlc-docs/features/hero-module/ only
  • Shared Artifacts: aidlc-docs/_shared/

Language Configuration

  • Documentation Language: English
  • Conversation Language: User Language (Dutch)
  • Note: Inherited from the other features in this workspace.

Source Of Truth / Coordination

  • Requested by Bryan via the session "SLP Software - SLS - Main" (2026-11-16). Starting points of Bryan: hero texts/image manageable in the CMS, immediately visible (NFR-10), but the hero LCP (image/text) must be in the first HTML (prerender / host injection), otherwise LCP regresses. Both sites (SLS and ASF) use it.
  • NFR-10 (SLS requirements): CMS content is live; baked or host-injected HTML for crawlers plus a client refresh; on failure the baked version stays.
  • Included in this feature (agreed 2026-11-16): align the SLS CI pipeline with ASF: production deploy only from a release/* branch (startsWith(github.ref, 'refs/heads/release/') on publish-sls-production and deploy-sls-production). The SLS site side is done by the SLS session.
  • No merge, production deploy or production variables without Bryan's explicit go.

Extension Configuration

Extension Enabled Decided At
Security Baseline Yes (blocking) Requirements Analysis (Q17 = A)
Property-Based Testing Partial (pure functions and round-trips) Requirements Analysis (Q18 = B)

Operations Configuration

  • Include Operations Phase: No
  • Decided At: Requirements Analysis (Q19 = B; hero points go into docs/release-checklist-productie.md)

Stage Progress

🔵 INCEPTION PHASE

  • Workspace Detection (classification: Feature)
  • Reverse Engineering (skipped: targeted review)
  • Requirements Analysis (approved by Bryan 2026-11-16)
  • User Stories (SKIP: one persona, acceptance criteria in the requirements)
  • Workflow Planning (approved by Bryan 2026-11-16)
  • Application Design (artifacts in inception/application-design/, awaiting approval)
  • Units Generation (unit-of-work.md, -dependency.md, -story-map.md; plan answered 2026-11-16)

🟢 CONSTRUCTION PHASE

  • Functional Design (bundled H1-H5, construction/functional-design/; answered 2026-11-16)
  • NFR Requirements (construction/nfr-requirements/)
  • NFR Design (construction/nfr-design/)
  • Infrastructure Design (media directory; construction/infrastructure-design/)
  • Code Generation - H0 to H6 built (LCP measurement on the test hosts is part of Build and Test)
  • Build and Test - closed 2026-11-17 (construction/build-and-test/build-and-test-summary.md)

🟡 OPERATIONS PHASE

  • SKIP (Q19 = B; points are in section 4b of docs/release-checklist-productie.md)