Docs: Build and Test en Operations van de features op deze branch gesloten; gezamenlijke productie-checklist (docs/release-checklist-productie.md)
Continuous Integration / config-sls (pull_request) Successful in 22s
Continuous Integration / config-asf (pull_request) Successful in 24s
Continuous Integration / changes (pull_request) Successful in 3m3s
Continuous Integration / backend-build (pull_request) Successful in 2m10s
Continuous Integration / compile-sites (pull_request) Successful in 2m10s
Continuous Integration / frontend-prepare (pull_request) Successful in 1m35s
Continuous Integration / frontend-build (pull_request) Successful in 1m46s
Continuous Integration / frontend-test (pull_request) Successful in 2m16s
Continuous Integration / frontend-lint (pull_request) Successful in 30s
Continuous Integration / backend-test (pull_request) Successful in 3m1s
Continuous Integration / vulnerability-scan (pull_request) Successful in 6m8s
Continuous Integration / publish-sls-test (pull_request) Skipped
Continuous Integration / publish-sls-production (pull_request) Skipped
Continuous Integration / deploy-sls-test (pull_request) Skipped
Continuous Integration / deploy-sls-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / smoke-sls-test (pull_request) Skipped
Continuous Integration / smoke-asf-test (pull_request) Skipped

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-16 11:41:01 +01:00
co-authored by Claude Sonnet 5.5
parent 8ec7ddd4fc
commit f9ee07da47
6 changed files with 109 additions and 21 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: cms-frontend
- **Project Type**: Brownfield
- **Start Date**: 2026-06-16T20:27:00Z
- **Current Stage**: CONSTRUCTION - Unit 6: Code Generation (Complete)
- **Current Stage**: CLOSED 2026-11-16 - all units built; Build and Test closed (frontend suite in CI); Operations folded into the joint production checklist
- **Branch**: unknown
## Workspace State
@@ -53,7 +53,7 @@
- [x] Unit 4 — Dashboard — COMPLETED 2026-06-22 (55/55 tests pass, build ✅)
- [x] Unit 5 — User Management — COMPLETED 2026-06-22 (all 21 steps done, tests written)
- [x] Unit 6 — Profile, Settings & CMS Placeholder — COMPLETED 2026-06-22 (all 25 steps done, tests written)
- [ ] Build and Test — Not Started
- [x] Build and Test — Closed 2026-11-16 (frontend vitest 531/531, lint and build run in CI as `frontend-test`; the admin has been in use on the test hosts)
### 🟡 OPERATIONS PHASE
- [ ] Operations — Placeholder
- [x] Operations — Included in the joint production checklist (`docs/release-checklist-productie.md`)
@@ -5,7 +5,7 @@
- **Feature Slug**: contact-forms-module
- **Project Type**: Brownfield
- **Start Date**: 2026-11-09
- **Current Stage**: PHASE 2 - CMS-U7, U5, U6, U8 and U9 built
- **Current Stage**: CLOSED 2026-11-16 - all units built, Build and Test closed, Operations folded into the joint production checklist (`docs/release-checklist-productie.md`)
- **Branch**: feature/contact-forms-module (worktree ..SlpModularCms-contact-forms, from master d9cc539; main checkout stays on feature/identity-email-notifications — never switch it)
## Workspace State
@@ -45,10 +45,10 @@
- [x] Application Design - EXECUTE (minimal; awaiting approval)
- [x] Units Generation - EXECUTE (awaiting approval)
### 🟢 CONSTRUCTION PHASE
- [ ] Functional Design - EXECUTE (U3, U4, U5)
- [ ] NFR Requirements/Design - EXECUTE (U2, U3)
- [ ] Infrastructure Design - SKIP
- [ ] Code Generation - EXECUTE per unit (plan approval first)
- [ ] Build and Test - EXECUTE
- [x] Functional Design - done per unit where needed
- [x] NFR Requirements/Design - done where needed (U2, U3)
- [x] Infrastructure Design - SKIP
- [x] Code Generation - complete (CMS-U0 to U12, plus banners, schedule, SEO, CI, host injection and translation files, documented under their own features)
- [x] Build and Test - closed 2026-11-16: `construction/build-and-test/build-and-test-summary.md`
### 🟡 OPERATIONS PHASE
- [ ] UNDECIDED (resolve at Build and Test)
- [x] Included in the joint production checklist (`docs/release-checklist-productie.md`), not run as separate stages. The production release waits for the owner's explicit go.
@@ -0,0 +1,30 @@
# Build and Test summary — contact-forms-module (and the features built on the same branch)
- **Closed**: 2026-11-16 (on Bryan's go, relayed by SLP Software - SLS - Main)
- **Branch**: `feature/contact-forms-module` (last code commit 8ec7ddd before the closing docs)
- **Scope**: Contact module (CMS-U0..U12), offering banners, offering schedule, website SEO, CI master pipeline, ASF host injection, translation files.
## Result
| Suite | Tests | Result |
|---|---|---|
| SlpModularCms.Core.Tests | 797 | pass |
| SlpModularCms.Modules.Offerings.Tests | 212 | pass |
| SlpModularCms.Modules.Availability.Tests | 171 | pass |
| SlpModularCms.Modules.Identity.Tests | 145 | pass |
| SlpModularCms.Api.Tests | 35 | pass |
| SlpModularCms.Modules.Contact.Tests (incl. OpenAPI snapshot, needs MariaDB) | 349 | pass |
| SlpModularCms.Modules.Master.Tests | 61 | pass |
| Frontend (vitest) | 531 | pass |
Also verified: the golden files for mails (42), the placeholder page and the website host injection (ASF golden files); end-to-end on the test hosts (anonymous smoke test `scripts/smoke-site.sh` on SLP-test and ASF-test, ETag/304, JSON-LD prices, sitemap address); Bryan accepted the contact form on the test host.
## Not verified here (carried into the production checklist)
- Live propagation of an admin change into the injected pages (needs an admin login on test-ASF).
- A real win-x64 self-contained publish (text resources verified as embedded in the assemblies only).
- Behaviour on production settings (`Website__NoIndex=false`, `Website__PublicBaseUrl`, retention).
## Operations
Not run as separate stages. Operations for all features on this branch is **included in the joint production checklist**: [docs/release-checklist-productie.md](../../../../../docs/release-checklist-productie.md).
@@ -188,7 +188,7 @@ Execution rounds (Q4 = B): **R1** = U1 + U2 · **R2** = U3 + U4 · **R3** = U5 +
(DSN, Umami website IDs, alert rules, 6 monitors) — not verified by execution from this session
(no access to those external accounts), taken on the user's report. Artifacts:
`operations/plans/monitoring-setup-plan.md`, `operations/monitoring/monitoring-instructions.md`
- [ ] Production Readiness Validation — **EXECUTE** (includes the `dotnet-appsettings` compliance gate)
- [x] Production Readiness Validation — Included in the joint production checklist (`docs/release-checklist-productie.md`, 2026-11-16); the real production release waits for the owner's go
## Execution Plan Summary
- **Risk Level**: High — three destructive-and-silent failure modes (customer website loss, Data Protection key-ring loss, automatic migration against production)