Docs: Build and Test en Operations van de features op deze branch gesloten; gezamenlijke productie-checklist (docs/release-checklist-productie.md)
Continuous Integration / config-sls (pull_request) Successful in 22s
Continuous Integration / config-asf (pull_request) Successful in 24s
Continuous Integration / changes (pull_request) Successful in 3m3s
Continuous Integration / backend-build (pull_request) Successful in 2m10s
Continuous Integration / compile-sites (pull_request) Successful in 2m10s
Continuous Integration / frontend-prepare (pull_request) Successful in 1m35s
Continuous Integration / frontend-build (pull_request) Successful in 1m46s
Continuous Integration / frontend-test (pull_request) Successful in 2m16s
Continuous Integration / frontend-lint (pull_request) Successful in 30s
Continuous Integration / backend-test (pull_request) Successful in 3m1s
Continuous Integration / vulnerability-scan (pull_request) Successful in 6m8s
Continuous Integration / publish-sls-test (pull_request) Skipped
Continuous Integration / publish-sls-production (pull_request) Skipped
Continuous Integration / deploy-sls-test (pull_request) Skipped
Continuous Integration / deploy-sls-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / smoke-sls-test (pull_request) Skipped
Continuous Integration / smoke-asf-test (pull_request) Skipped

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-16 11:41:01 +01:00
co-authored by Claude Sonnet 5.5
parent 8ec7ddd4fc
commit f9ee07da47
6 changed files with 109 additions and 21 deletions
+10 -10
View File
@@ -3,11 +3,11 @@
| Type | Name | Status | Branch | Affected Components | Session Start |
|------|------|--------|--------|---------------------|---------------|
| Feature | SlpModularCms.Api Implementation (slp-modular-cms-api) | ✅ Complete | unknown | Core, Identity, Availability, Shell | 2026-06-07 |
| Feature | CMS Frontend (cms-frontend) | ✅ Complete | unknown | Frontend, Identity (Auth), Availability | 2026-06-16 |
| Feature | CMS Frontend (cms-frontend) | ✅ Complete (Build and Test en Operations gesloten 2026-11-16) | unknown | Frontend, Identity (Auth), Availability | 2026-06-16 |
| Feature | Master CMS Module (master-cms-module) | ✅ Complete | unknown | Modules, Availability | 2026-06-26 |
| Feature | Tech Debt Backlog (tech-debt-backlog) | 🔵 Inception | unknown | Modules.Master, Frontend | 2026-07-01 |
| Feature | Tech Debt Backlog (tech-debt-backlog) | 🔵 Doorlopende backlog (bewust open) | unknown | Modules.Master, Frontend | 2026-07-01 |
| Feature | Local Dev Master/Slave Setup (local-dev-master-slave-setup) | ✅ Complete | unknown | Modules.Master, Api, Frontend | 2026-07-02 |
| Feature | Gitea Deployment Workflow (gitea-deployment-workflow) | 🟡 Operations (wacht op CI-proef en eerste test-deploy) | feature/gitea-deployment-workflow | CI/CD, Api (hosting/config), Core, Modules, Frontend (build), Docs | 2026-07-27 |
| Feature | Gitea Deployment Workflow (gitea-deployment-workflow) | ✅ Complete (CI en test-deploys draaien; productiecontrole in de gezamenlijke checklist, 2026-11-16) | feature/gitea-deployment-workflow | CI/CD, Api (hosting/config), Core, Modules, Frontend (build), Docs | 2026-07-27 |
| Feature | SlpSoftware Production API (slpsoftware-api) | ✅ Complete | feature/slpsoftware-api | Clients (new Api.SlpSoftware), Modules (new Offerings module + Tests), Core (CmsHost), CI/CD (retargeted to Api.SlpSoftware) | 2026-08-02 |
| Feature | Andrea's site hosting (andreaslop-site-hosting) | ✅ Complete (gemerged naar master via PR #11, 2026-11-10; ASF-productie op IIS apart) | feature/andreaslop-site-hosting | Core (CmsHost, CSP, static content), Clients (new Api.AndreaSlopFotografie), Frontend (theme), CI/CD | 2026-11-06 |
| Bug | [cms-admin-nine-points](bugs/cms-admin-nine-points/bug-fix.md) | ✅ Complete (gemerged via PR #11, 2026-11-10) | feature/andreaslop-site-hosting | Core (auth, invitations), Identity, Availability, Frontend | 2026-11-08 |
@@ -16,11 +16,11 @@
| Bug | [owner-cannot-promote-requester-identity](bugs/owner-cannot-promote-requester-identity/bug-fix.md) | ✅ Complete (gemerged via PR #11, 2026-11-10) | feature/identity-email-notifications | Identity (UsersController) | 2026-11-08 |
| Bug | [availability-gate-blocks-website-and-admin](bugs/availability-gate-blocks-website-and-admin/bug-fix.md) | ✅ Complete (gemerged via PR #11, 2026-11-10) | feature/identity-email-notifications | Availability (middleware) | 2026-11-09 |
| Bug | [setup-page-after-failed-status-read](bugs/setup-page-after-failed-status-read/bug-fix.md) | ✅ Complete (gemerged via PR #11, 2026-11-10) | feature/identity-email-notifications | Frontend (router guard, login), Identity (Setup limiter) | 2026-11-09 |
| Feature | Contact Forms Module (contact-forms-module) | 🟡 Op test (CMS-U1 t/m U12 gebouwd en gepusht, o.a. Berichten-admin U6/U12, Offerings mobiele FAB U8, Friendly Captcha U9; contactformulier door Bryan op test geaccepteerd; niet gemerged, productie wacht op Bryans go) | feature/contact-forms-module | Modules (new Contact + Tests, Offerings category), Core (OnRejected, availability gate marker), Frontend (admin Berichten) | 2026-11-09 |
| Feature | [Offering banners (offering-banners)](features/offering-banners/overview.md) | 🟡 Op test (buiten AI-DLC gebouwd en achteraf gedocumenteerd; admin-lijst met Locatie-badge op test sinds 2026-11-15) | feature/contact-forms-module | Modules.Offerings (banner met positie top/bottom), openapi, Frontend (admin Aanbiedingen > Banner) | 2026-11-12 |
| Feature | [Offering schedule (offering-schedule)](features/offering-schedule/overview.md) | 🟡 Op test zodra CI-run 109 is uitgerold (buiten AI-DLC gebouwd en achteraf gedocumenteerd) | feature/contact-forms-module | Modules.Offerings (aan/uit en van/tot per pakket, `/offerings/all`), openapi, Frontend (admin pakketformulier en -lijst) | 2026-11-15 |
| Feature | [Website SEO (website-seo)](features/website-seo/overview.md) | 🟡 Op SLP-test (buiten AI-DLC gebouwd en achteraf gedocumenteerd; productie vraagt `Website__NoIndex=false` en `Website__PublicBaseUrl`) | feature/contact-forms-module | Core (Hosting/Website), Modules.Offerings (index-markers), Api.SlpSoftware (appsettings) | 2026-11-11 |
| Feature | [CI bouwt en test alleen het master-CMS (ci-master-pipeline)](features/ci-master-pipeline/overview.md) | 🟡 Gepusht, eerste CI-run met de nieuwe workflow volgt (buiten AI-DLC gebouwd en achteraf gedocumenteerd) | feature/contact-forms-module | CI/CD (workflow, slnf, rooktest), Core (Website:Mode), Api (alle modules), Tests (ASF-testproject opgeheven) | 2026-11-15 |
| Feature | [ASF: host injecteert in voorgerenderde pagina's (asf-host-injection)](features/asf-host-injection/plan.md) | 🔵 Voorstel; bouwen wacht op Bryans akkoord en op .NET 10 op het hostingpakket | feature/contact-forms-module | Core (Hosting/Website), Modules.Offerings, docs | 2026-11-15 |
| Feature | [Vertaalbestanden backend (translation-files)](../docs/translation-files.md) | 🟡 Gepusht (stappen 1-5, docs); nog niet gedeployd (buiten AI-DLC gebouwd; goedgekeurd door Bryan via SLS-Main) | feature/contact-forms-module | Core (Texts, Email, Identity, Hosting), Modules.Availability, Modules.Offerings | 2026-11-15 |
| Feature | Contact Forms Module (contact-forms-module) | ✅ Afgesloten 2026-11-16 (U1 t/m U12 gebouwd, Build and Test gesloten, Operations in de [gezamenlijke productie-checklist](../docs/release-checklist-productie.md); contactformulier door Bryan op test geaccepteerd; productie wacht op Bryans go) | feature/contact-forms-module | Modules (new Contact + Tests, Offerings category), Core (OnRejected, availability gate marker), Frontend (admin Berichten) | 2026-11-09 |
| Feature | [Offering banners (offering-banners)](features/offering-banners/overview.md) | ✅ Afgesloten 2026-11-16 (op test; buiten AI-DLC gebouwd en achteraf gedocumenteerd) | feature/contact-forms-module | Modules.Offerings (banner met positie top/bottom), openapi, Frontend (admin Aanbiedingen > Banner) | 2026-11-12 |
| Feature | [Offering schedule (offering-schedule)](features/offering-schedule/overview.md) | ✅ Afgesloten 2026-11-16 (op test; buiten AI-DLC gebouwd en achteraf gedocumenteerd) | feature/contact-forms-module | Modules.Offerings (aan/uit en van/tot per pakket, `/offerings/all`), openapi, Frontend (admin pakketformulier en -lijst) | 2026-11-15 |
| Feature | [Website SEO (website-seo)](features/website-seo/overview.md) | ✅ Afgesloten 2026-11-16 (op SLP-test; productie vraagt `Website__NoIndex=false` en `Website__PublicBaseUrl`, zie de productie-checklist) | feature/contact-forms-module | Core (Hosting/Website), Modules.Offerings (index-markers), Api.SlpSoftware (appsettings) | 2026-11-11 |
| Feature | [CI bouwt en test alleen het master-CMS (ci-master-pipeline)](features/ci-master-pipeline/overview.md) | ✅ Afgesloten 2026-11-16 (buiten AI-DLC gebouwd en achteraf gedocumenteerd) | feature/contact-forms-module | CI/CD (workflow, slnf, rooktest), Core (Website:Mode), Api (alle modules), Tests (ASF-testproject opgeheven) | 2026-11-15 |
| Feature | [ASF: host injecteert in voorgerenderde pagina's (asf-host-injection)](features/asf-host-injection/plan.md) | ✅ Gebouwd en op test (afgesloten 2026-11-16; ASF-productie op IIS is een apart, later plan) | feature/contact-forms-module | Core (Hosting/Website), Modules.Offerings, docs | 2026-11-15 |
| Feature | [Vertaalbestanden backend (translation-files)](../docs/translation-files.md) | ✅ Afgesloten 2026-11-16 (stappen 1-8, docs; buiten AI-DLC gebouwd; goedgekeurd door Bryan via SLS-Main; productie via de checklist) | feature/contact-forms-module | Core (Texts, Email, Identity, Hosting), Modules.Availability, Modules.Offerings | 2026-11-15 |
| Bug | [theme-toggle-first-click](bugs/theme-toggle-first-click/bug-fix.md) | ✅ Complete (niet gecommit/gemerged; buiten AI-DLC gebouwd; oorzaak niet in een echte browser nagebootst) | feature/contact-forms-module | Frontend (useTheme, index.html) | 2026-11-15 |
@@ -5,7 +5,7 @@
- **Feature Slug**: cms-frontend
- **Project Type**: Brownfield
- **Start Date**: 2026-06-16T20:27:00Z
- **Current Stage**: CONSTRUCTION - Unit 6: Code Generation (Complete)
- **Current Stage**: CLOSED 2026-11-16 - all units built; Build and Test closed (frontend suite in CI); Operations folded into the joint production checklist
- **Branch**: unknown
## Workspace State
@@ -53,7 +53,7 @@
- [x] Unit 4 — Dashboard — COMPLETED 2026-06-22 (55/55 tests pass, build ✅)
- [x] Unit 5 — User Management — COMPLETED 2026-06-22 (all 21 steps done, tests written)
- [x] Unit 6 — Profile, Settings & CMS Placeholder — COMPLETED 2026-06-22 (all 25 steps done, tests written)
- [ ] Build and Test — Not Started
- [x] Build and Test — Closed 2026-11-16 (frontend vitest 531/531, lint and build run in CI as `frontend-test`; the admin has been in use on the test hosts)
### 🟡 OPERATIONS PHASE
- [ ] Operations — Placeholder
- [x] Operations — Included in the joint production checklist (`docs/release-checklist-productie.md`)
@@ -5,7 +5,7 @@
- **Feature Slug**: contact-forms-module
- **Project Type**: Brownfield
- **Start Date**: 2026-11-09
- **Current Stage**: PHASE 2 - CMS-U7, U5, U6, U8 and U9 built
- **Current Stage**: CLOSED 2026-11-16 - all units built, Build and Test closed, Operations folded into the joint production checklist (`docs/release-checklist-productie.md`)
- **Branch**: feature/contact-forms-module (worktree ..SlpModularCms-contact-forms, from master d9cc539; main checkout stays on feature/identity-email-notifications — never switch it)
## Workspace State
@@ -45,10 +45,10 @@
- [x] Application Design - EXECUTE (minimal; awaiting approval)
- [x] Units Generation - EXECUTE (awaiting approval)
### 🟢 CONSTRUCTION PHASE
- [ ] Functional Design - EXECUTE (U3, U4, U5)
- [ ] NFR Requirements/Design - EXECUTE (U2, U3)
- [ ] Infrastructure Design - SKIP
- [ ] Code Generation - EXECUTE per unit (plan approval first)
- [ ] Build and Test - EXECUTE
- [x] Functional Design - done per unit where needed
- [x] NFR Requirements/Design - done where needed (U2, U3)
- [x] Infrastructure Design - SKIP
- [x] Code Generation - complete (CMS-U0 to U12, plus banners, schedule, SEO, CI, host injection and translation files, documented under their own features)
- [x] Build and Test - closed 2026-11-16: `construction/build-and-test/build-and-test-summary.md`
### 🟡 OPERATIONS PHASE
- [ ] UNDECIDED (resolve at Build and Test)
- [x] Included in the joint production checklist (`docs/release-checklist-productie.md`), not run as separate stages. The production release waits for the owner's explicit go.
@@ -0,0 +1,30 @@
# Build and Test summary — contact-forms-module (and the features built on the same branch)
- **Closed**: 2026-11-16 (on Bryan's go, relayed by SLP Software - SLS - Main)
- **Branch**: `feature/contact-forms-module` (last code commit 8ec7ddd before the closing docs)
- **Scope**: Contact module (CMS-U0..U12), offering banners, offering schedule, website SEO, CI master pipeline, ASF host injection, translation files.
## Result
| Suite | Tests | Result |
|---|---|---|
| SlpModularCms.Core.Tests | 797 | pass |
| SlpModularCms.Modules.Offerings.Tests | 212 | pass |
| SlpModularCms.Modules.Availability.Tests | 171 | pass |
| SlpModularCms.Modules.Identity.Tests | 145 | pass |
| SlpModularCms.Api.Tests | 35 | pass |
| SlpModularCms.Modules.Contact.Tests (incl. OpenAPI snapshot, needs MariaDB) | 349 | pass |
| SlpModularCms.Modules.Master.Tests | 61 | pass |
| Frontend (vitest) | 531 | pass |
Also verified: the golden files for mails (42), the placeholder page and the website host injection (ASF golden files); end-to-end on the test hosts (anonymous smoke test `scripts/smoke-site.sh` on SLP-test and ASF-test, ETag/304, JSON-LD prices, sitemap address); Bryan accepted the contact form on the test host.
## Not verified here (carried into the production checklist)
- Live propagation of an admin change into the injected pages (needs an admin login on test-ASF).
- A real win-x64 self-contained publish (text resources verified as embedded in the assemblies only).
- Behaviour on production settings (`Website__NoIndex=false`, `Website__PublicBaseUrl`, retention).
## Operations
Not run as separate stages. Operations for all features on this branch is **included in the joint production checklist**: [docs/release-checklist-productie.md](../../../../../docs/release-checklist-productie.md).
@@ -188,7 +188,7 @@ Execution rounds (Q4 = B): **R1** = U1 + U2 · **R2** = U3 + U4 · **R3** = U5 +
(DSN, Umami website IDs, alert rules, 6 monitors) — not verified by execution from this session
(no access to those external accounts), taken on the user's report. Artifacts:
`operations/plans/monitoring-setup-plan.md`, `operations/monitoring/monitoring-instructions.md`
- [ ] Production Readiness Validation — **EXECUTE** (includes the `dotnet-appsettings` compliance gate)
- [x] Production Readiness Validation — Included in the joint production checklist (`docs/release-checklist-productie.md`, 2026-11-16); the real production release waits for the owner's go
## Execution Plan Summary
- **Risk Level**: High — three destructive-and-silent failure modes (customer website loss, Data Protection key-ring loss, automatic migration against production)