Hero-module: audit en status na de bouw van H1 t/m H6

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-16 16:10:43 +01:00
co-authored by Claude Sonnet 5.5
parent 7ae05e3fc0
commit d597faf86a
2 changed files with 14 additions and 2 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: hero-module
- **Project Type**: Brownfield
- **Start Date**: 2026-11-16
- **Current Stage**: CONSTRUCTION - Code Generation (H1 first)
- **Current Stage**: CONSTRUCTION - Build and Test (first test deploy next)
- **Branch**: feature/hero-module (worktree K:\Development\Projects\SlpModularCms-contact-forms, from master b2cacfe)
## Workspace State
@@ -53,7 +53,7 @@
- [x] NFR Requirements (construction/nfr-requirements/)
- [x] NFR Design (construction/nfr-design/)
- [x] Infrastructure Design (media directory; construction/infrastructure-design/)
- [ ] Code Generation - per unit: H0 to H5 done; H6 (seed, docs, smoke, LCP measure) open
- [x] Code Generation - H0 to H6 built (LCP measurement on the test hosts is part of Build and Test)
- [ ] Build and Test - EXECUTE
### 🟡 OPERATIONS PHASE
- [ ] SKIP (Q19 = B; points go into the joint production checklist)