Completes Operations phase: Monitoring Setup and Production Readiness Validation
Confirms existing tag-based Sentry alerting and domain-based UptimeRobot/ Umami monitoring already cover the Offerings module and the Api.SlpSoftware cutover with no new configuration. Closes the SECURITY-13 audit-trail open item and records the final production-readiness traceability, completing the slpsoftware-api feature's AI-DLC lifecycle. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01FWyStNL2ZsjrS7FLd7xvvN
This commit is contained in:
@@ -5,7 +5,7 @@
|
||||
- **Feature Slug**: slpsoftware-api
|
||||
- **Project Type**: Brownfield
|
||||
- **Start Date**: 2026-08-01T00:00:00Z
|
||||
- **Current Stage**: CONSTRUCTION complete — both units done, feature-wide Build and Test green; ready for OPERATIONS phase
|
||||
- **Current Stage**: OPERATIONS phase complete — Production Readiness Validation passed; feature complete pending the user's host-side systemd action
|
||||
- **Branch**: feature/slpsoftware-api (PR #9 open against master)
|
||||
|
||||
## Workspace State
|
||||
@@ -85,11 +85,11 @@
|
||||
|
||||
### 🟡 OPERATIONS PHASE
|
||||
- [x] Deployment Setup — Complete. `continuous_integration.yaml` retargeted to `Api.SlpSoftware` (D-15 cutover); `deploy-scp.yaml`/`rollback-plan.md` needed no changes; `deployment-instructions.md` § 1.6 updated with an explicit manual host-side action item for the user (edit the Pi's existing systemd units). No nginx/database/Gitea-variable changes (D-6).
|
||||
- [ ] Monitoring Setup — EXECUTE
|
||||
- [ ] Production Readiness Validation — EXECUTE (ALWAYS, once phase reached)
|
||||
- [x] Monitoring Setup — Complete. Investigated: Sentry alert rules (tag-based) and the global authorization-denial handler already cover the new `offerings-public` rate-limit policy and `OfferingsController`'s `AdminOnly` actions automatically; UptimeRobot/Umami/Gitea variables are domain-based, unaffected by the D-15 cutover. No new configuration needed — documented as a confirmation, not new setup.
|
||||
- [x] Production Readiness Validation — Complete. All 9 FRs, 4 NFRs, 12 user stories, and 15 Security Compliance rules traced and confirmed; SECURITY-13's open item formally closed in `requirements.md`; verdict: ready for production contingent on the one pending host-side systemd action.
|
||||
|
||||
## Current Status
|
||||
- **Lifecycle Phase**: OPERATIONS
|
||||
- **Current Stage**: Deployment Setup — Complete (repo-side changes done; user still needs to manually update the Pi's two systemd unit files)
|
||||
- **Next Stage**: Monitoring Setup, then Production Readiness Validation
|
||||
- **Status**: Awaiting user approval to proceed
|
||||
- **Lifecycle Phase**: OPERATIONS — COMPLETE
|
||||
- **Current Stage**: Production Readiness Validation — Complete (`operations/production-readiness/production-readiness-validation.md`)
|
||||
- **Next Stage**: None — feature complete, pending user's host-side systemd action and manual reference-content entry (§ 6 of the validation doc)
|
||||
- **Status**: Awaiting user's final approval to close out the feature
|
||||
|
||||