Completes Operations phase: Monitoring Setup and Production Readiness Validation

Confirms existing tag-based Sentry alerting and domain-based UptimeRobot/
Umami monitoring already cover the Offerings module and the Api.SlpSoftware
cutover with no new configuration. Closes the SECURITY-13 audit-trail open
item and records the final production-readiness traceability, completing
the slpsoftware-api feature's AI-DLC lifecycle.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01FWyStNL2ZsjrS7FLd7xvvN
This commit is contained in:
2026-08-02 16:35:00 +02:00
co-authored by Claude Sonnet 5
parent cfb06b28b6
commit 81af6cd151
7 changed files with 223 additions and 9 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: slpsoftware-api
- **Project Type**: Brownfield
- **Start Date**: 2026-08-01T00:00:00Z
- **Current Stage**: CONSTRUCTION complete — both units done, feature-wide Build and Test green; ready for OPERATIONS phase
- **Current Stage**: OPERATIONS phase complete — Production Readiness Validation passed; feature complete pending the user's host-side systemd action
- **Branch**: feature/slpsoftware-api (PR #9 open against master)
## Workspace State
@@ -85,11 +85,11 @@
### 🟡 OPERATIONS PHASE
- [x] Deployment Setup — Complete. `continuous_integration.yaml` retargeted to `Api.SlpSoftware` (D-15 cutover); `deploy-scp.yaml`/`rollback-plan.md` needed no changes; `deployment-instructions.md` § 1.6 updated with an explicit manual host-side action item for the user (edit the Pi's existing systemd units). No nginx/database/Gitea-variable changes (D-6).
- [ ] Monitoring Setup — EXECUTE
- [ ] Production Readiness Validation — EXECUTE (ALWAYS, once phase reached)
- [x] Monitoring Setup — Complete. Investigated: Sentry alert rules (tag-based) and the global authorization-denial handler already cover the new `offerings-public` rate-limit policy and `OfferingsController`'s `AdminOnly` actions automatically; UptimeRobot/Umami/Gitea variables are domain-based, unaffected by the D-15 cutover. No new configuration needed — documented as a confirmation, not new setup.
- [x] Production Readiness Validation — Complete. All 9 FRs, 4 NFRs, 12 user stories, and 15 Security Compliance rules traced and confirmed; SECURITY-13's open item formally closed in `requirements.md`; verdict: ready for production contingent on the one pending host-side systemd action.
## Current Status
- **Lifecycle Phase**: OPERATIONS
- **Current Stage**: Deployment Setup — Complete (repo-side changes done; user still needs to manually update the Pi's two systemd unit files)
- **Next Stage**: Monitoring Setup, then Production Readiness Validation
- **Status**: Awaiting user approval to proceed
- **Lifecycle Phase**: OPERATIONS — COMPLETE
- **Current Stage**: Production Readiness Validation — Complete (`operations/production-readiness/production-readiness-validation.md`)
- **Next Stage**: None — feature complete, pending user's host-side systemd action and manual reference-content entry (§ 6 of the validation doc)
- **Status**: Awaiting user's final approval to close out the feature