Closes round 4 - all seven units generated
U7 was the last one. State doc corrected: it had U7 down for an infrastructure design pass that never actually happened, because by the time units were carved up U7 had shrunk to documentation only.
This commit is contained in:
@@ -1181,3 +1181,14 @@ by Infrastructure Design. U5 carries REF-U3-01's Umami origin gate plus FR-21 an
|
||||
**Context**: CONSTRUCTION — Round 4 — U7 Code Generation complete, presenting completion message
|
||||
|
||||
---
|
||||
## Code Generation — U7 (Approved) / Round 4 Closed / All Units Complete
|
||||
|
||||
**Timestamp**: 2026-07-28T02:05:00Z
|
||||
|
||||
**User Input**: "Continue to Next Stage"
|
||||
|
||||
**AI Response**: "U7 approved and committed (88770c5). Round 4 closed — all 7 units (U1-U7) are now complete. Corrected aidlc-state.md: Infrastructure Design's original plan listed U7, but its scope narrowed to documentation-only by Units Generation, so it never needed the stage in practice. Proceeding to the phase-level Build and Test stage."
|
||||
|
||||
**Context**: CONSTRUCTION — all units complete; entering Build and Test
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user