Closes round 4 - all seven units generated
U7 was the last one. State doc corrected: it had U7 down for an infrastructure design pass that never actually happened, because by the time units were carved up U7 had shrunk to documentation only.
This commit is contained in:
@@ -68,9 +68,9 @@ Execution rounds (Q4 = B): **R1** = U1 + U2 · **R2** = U3 + U4 · **R3** = U5 +
|
||||
- [x] Functional Design — **EXECUTE for U1, U2, U3, U4**; SKIP for U5, U6, U7. **U1 ✅ U2 ✅** approved 2026-07-27 · **U3 ✅ U4 ✅** 2026-07-28
|
||||
- [ ] NFR Requirements — **SKIP (all units)** — already comprehensively captured in `requirements.md` § 5 and § 6
|
||||
- [x] NFR Design — **EXECUTE for U3, U4**; SKIP for the rest. *Deliberate deviation from the default NFR-Requirements/NFR-Design coupling — rationale in the execution plan.* **U3 ✅ U4 ✅** 2026-07-28 — 11 patterns for U3, 10 for U4. Closed OPEN-01; raised REF-U3-01
|
||||
- [ ] Infrastructure Design — **EXECUTE for U6, U7**; SKIP for the rest
|
||||
- [~] Code Generation — **EXECUTE** (all 7 units, each built and tested before its completion message). **U1 ✅ U2 ✅** 2026-07-27 (253 backend tests). **U3 ✅** 2026-07-28 (315). **U4 ✅** 2026-07-28 (366 backend + 237 frontend)
|
||||
- [ ] Build and Test — **EXECUTE**
|
||||
- [x] Infrastructure Design — **EXECUTE for U6, U7 per the original plan; SKIP for the rest**. **U6 ✅** 2026-07-28 — single Pi, directory-only environment split, `systemd --user` (no sudo), releases/current/shared layout, 2-release retention, health check via public URL. Raised INFRA-U6-01 (linger requirement, carried to Operations). **U7 did not need it in practice**: by Units Generation, U7's scope had narrowed to documentation-only (Q8 = A — operational/infrastructure decisions moved to Operations), so it went straight to Code Generation with no infrastructure to design
|
||||
- [x] Code Generation — **EXECUTE** (all 7 units, each built and tested before its completion message). **U1 ✅ U2 ✅** 2026-07-27 (253 backend tests). **U3 ✅** 2026-07-28 (315). **U4 ✅** 2026-07-28 (366 backend + 237 frontend). **U6 ✅ U5 ✅** 2026-07-28 — Round 3: `deploy-scp.yaml` + `continuous_integration.yaml`, 372 backend + 237 frontend tests (unchanged from Round 2, confirming no regressions from FR-21/FR-22 fixes), 0 vulnerable packages, lint clean. Raised REF-U5-01 (Umami-origin gate needs a parallel Gitea variable, since the backend side is a host env var per D-16). **U7 ✅** 2026-07-28 — Round 4: `WEBSITE_WORKSPACE.md`, README.md and `.env.example` updated, all claims re-verified against actual U1–U6 source. **All 7 units complete.**
|
||||
- [ ] Build and Test — **EXECUTE** (phase-level, now that all 7 units are complete)
|
||||
|
||||
### OPERATIONS
|
||||
- [ ] Deployment Setup — **EXECUTE**
|
||||
@@ -84,9 +84,9 @@ Execution rounds (Q4 = B): **R1** = U1 + U2 · **R2** = U3 + U4 · **R3** = U5 +
|
||||
|
||||
## Current Status
|
||||
- **Lifecycle Phase**: CONSTRUCTION
|
||||
- **Current Stage**: Round 2 complete — U3 Security Headers & CSP and U4 Observability generated, built and tested
|
||||
- **Next Stage**: Round 3 — U5 CI Workflow & Gates + U6 Deploy Workflow (U6 needs Infrastructure Design first)
|
||||
- **Status**: Round 2 **closed** 2026-07-28. Rounds 1 and 2 committed, nothing pushed. Awaiting approval to start Round 3
|
||||
- **Current Stage**: Round 4 **closed** 2026-07-28 — U7 complete and committed (`88770c5`). All 7 units of work are now generated
|
||||
- **Next Stage**: Build and Test (phase-level) — the last Construction stage before Operations
|
||||
- **Status**: Rounds 1–4 all done, nothing pushed. Starting Build and Test
|
||||
|
||||
## Round 2 Design Record (2026-07-28)
|
||||
- Functional Design U3 + U4 complete and committed (`357d395`)
|
||||
|
||||