Docs: hero zonder planning en hero-brede aan/uit (FR-05, BR-H07/BR-P01, aannamelijst 30, contract)
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -34,3 +34,4 @@ Kept while Bryan was away (2026-11-16): no questions to him, a likely assumption
|
||||
| 28 | **The focus dialog showed a stretched photo** for any photo that is not 3:2: it used the published wide crop (`image.src`) as if it were the whole photo. | Every set now also holds a full-frame preview (`full-<width>.webp`, the whole picture at its own shape, at most 1280 wide); the admin API gives it as `previewSrc`, it is not in `variants` and not published to websites. Sets made before it existed get only that file added by the background renderer (not shown as processing, no address changes). | Without a preview yet the dialog says so instead of showing a wrong picture. | `VariantPlanner.Preview`, `HeroMapping.PreviewSrc`, `FocusDialog` |
|
||||
| 29 | **A photo could stay "processing" for ever** in the admin: a photo that was uploaded but not saved yet only had the state of the upload response. | The page now asks the server for those photos one by one (`GET /api/v1/hero/images/{id}`, every 5 s while processing, also in a background tab); each photo shows its own state and, when done, a short "Processing finished" note on that photo (no toast). A photo that was already in the CMS (`reused`, internal only) looks the same and is ready at once. | n/a | `heroImageQuery`, `DoneStatus` |
|
||||
|
||||
| 30 | **Planning (from/to) and the hero-wide on/off are gone** (Bryan, 2026-11-17): the hero is part of the design and always on; a planning per slide became too much trouble. | Removed from model, API (PUT/GET, OpenAPI), validation, host logic (`IsLive` = has a title), admin (fields, nl/en texts) and tests; migration `RemoveHeroScheduleAndSwitch` drops `StartsAt`, `EndsAt` and `IsActive` of the hero (the per-slide `IsActive` stays). The public JSON, golden files and both sites did not depend on them. Without hero data the host writes nothing. | Planning can be added later, probably per slide; a hero-wide switch likewise. | `HeroMapping.IsLive`, migration `RemoveHeroScheduleAndSwitch` |
|
||||
|
||||
Reference in New Issue
Block a user