Docs: feature identity-email-notifications afgesloten (productie 2026-11-10, run 639); andreaslop-site-hosting als afgehandeld gemarkeerd (via PR #11)
Continuous Integration / config (pull_request) Successful in 10s
Continuous Integration / changes (pull_request) Successful in 21s
Continuous Integration / backend-build (pull_request) Skipped
Continuous Integration / backend-test (pull_request) Skipped
Continuous Integration / vulnerability-scan (pull_request) Skipped
Continuous Integration / frontend-prepare (pull_request) Skipped
Continuous Integration / frontend-build (pull_request) Skipped
Continuous Integration / frontend-test (pull_request) Skipped
Continuous Integration / frontend-lint (pull_request) Skipped
Continuous Integration / publish-test (pull_request) Skipped
Continuous Integration / publish-production (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / deploy-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / config-asf (pull_request) Successful in 9s
Continuous Integration / deploy-asf-test (pull_request) Skipped
Continuous Integration / config (pull_request) Successful in 10s
Continuous Integration / changes (pull_request) Successful in 21s
Continuous Integration / backend-build (pull_request) Skipped
Continuous Integration / backend-test (pull_request) Skipped
Continuous Integration / vulnerability-scan (pull_request) Skipped
Continuous Integration / frontend-prepare (pull_request) Skipped
Continuous Integration / frontend-build (pull_request) Skipped
Continuous Integration / frontend-test (pull_request) Skipped
Continuous Integration / frontend-lint (pull_request) Skipped
Continuous Integration / publish-test (pull_request) Skipped
Continuous Integration / publish-production (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / deploy-production (pull_request) Skipped
Continuous Integration / publish-asf-test (pull_request) Skipped
Continuous Integration / config-asf (pull_request) Successful in 9s
Continuous Integration / deploy-asf-test (pull_request) Skipped
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -5,7 +5,7 @@
|
||||
- **Feature Slug**: andreaslop-site-hosting
|
||||
- **Project Type**: Brownfield
|
||||
- **Start Date**: 2026-11-06T00:06:13Z
|
||||
- **Current Stage**: OPERATIONS - Production Readiness (complete; waiting for CI proof and first test deploy)
|
||||
- **Current Stage**: COMPLETE for the test environment - merged to master on 2026-11-10 through PR #11 (master e671078, together with identity-email-notifications). ASF production (IIS) is a separate piece of work.
|
||||
- **Branch**: feature/andreaslop-site-hosting
|
||||
- **Request Type**: Feature (two units: U1 core-site-hosting, U2 andreaslop-client)
|
||||
|
||||
@@ -60,3 +60,6 @@
|
||||
|
||||
### Production Readiness
|
||||
- **Verdict**: Yes with caveats (test only), see operations/production-readiness-checklist.md
|
||||
|
||||
### Handled on 2026-11-10
|
||||
`feature/andreaslop-site-hosting` was never merged on its own. Its 24 commits were part of the ancestry of `feature/identity-email-notifications` and went to master with PR #11 (merge commit e671078). Nothing remains unmerged. ASF production on IIS is a separate, later piece of work (see `../identity-email-notifications/operations/deployment/deployment-plan.md`).
|
||||
|
||||
@@ -474,3 +474,13 @@
|
||||
## Redeploy after the invitation-link fix
|
||||
**Timestamp**: 2026-11-08
|
||||
**Run**: 612 (dispatch, deploy_asf_test only), head 0908f42, all gates and deploy-asf-test green. Live: /health version 1.0.0+0908f42; /admin/invite/complete?token=x 200 text/html (SPA); old /invite/complete?token=x on ASF 404 website page (acceptable); /admin/ and favicon unchanged.
|
||||
|
||||
---
|
||||
|
||||
## Merged to master
|
||||
|
||||
**Timestamp**: 2026-11-10T18:00:00Z
|
||||
|
||||
**AI Response**: "feature/andreaslop-site-hosting is handled: its 24 commits reached master through PR #11 (merge commit e671078) together with identity-email-notifications, as reported by the coordinating session after Bryan's approval. ASF production on IIS stays a separate piece of work."
|
||||
|
||||
---
|
||||
|
||||