Handback-documenten bijgewerkt, Build-and-Test-aanvulling, Operations-vragen e-mailfeature

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-09 09:03:49 +01:00
co-authored by Claude Sonnet 5.5
parent ff94719455
commit 0e86125f12
7 changed files with 155 additions and 0 deletions
@@ -34,3 +34,16 @@ Scope: the TEST environment `test.andreaslop.nl`. Production is out of scope; it
6. Merging to master deploys the shared Core change and patched packages to SlpSoftware test automatically; watch that deploy.
7. Doc-only commits are local and unpushed.
8. Production for Andrea Slop Fotografie (not prepared, listed only): own database and user, port 5201, own proxy route and certificate, `Website__NoIndex=false`, own `shared/env`, production deploy path/variables and an approval decision, production Sentry environment and alert rules, backup entry, HSTS preload/redirect review, decision on the placeholder radius and dark mode.
## Status update 2026-11-09 (open follow-ups above, now)
1. CI proof: done (runs 607 onward, all later runs green except one timer flake fixed in 892c548).
2. First test deploy: DONE (run 608, then 610, 612, 613-626 on the branch). ASF test is live and used by Bryan and Andrea.
3. After the first deploy: first administrators exist (Andrea Owner, Bryan Administrator); the verification list was exercised in use. Still to confirm by Bryan/Pi-Main: setup token removed from `shared/env`, forwarded-header behaviour observed (per-client rate-limit partitions), optional Pi timing.
4. Sentry alert rules: not confirmed created (owner: "CMS & API" with Bryan's go). Open.
5. Backup entry for the test database: not confirmed (Pi-Main). Open.
6. Merge to master (and the automatic SlpSoftware test deploy of the shared Core changes, which are now much larger: see handback-u2 addendum): not done, needs Bryan's explicit go; the branch has already been deployed to SlpSoftware test once (run 625/626/627 from the e-mail branch).
7. Doc commits: pushed.
8. Production: unchanged (not prepared).
Operations questions for this feature were all answered (deployment Q1-5 "alles A", monitoring Q1-5 recommended, Q2 = D). Nothing in this feature's Operations stage is waiting for an answer; what remains is the list above plus the e-mail feature's own Operations stage.
Note: the log-level variable in the documents above was replaced by `Website__LogLevel` (a variable name with a dot is ignored by systemd).