Status feature afgerond (test), Operations opgenomen in gezamenlijke release-checklist
Continuous Integration / config (pull_request) Successful in 51s
Continuous Integration / prepare (pull_request) Successful in 1m42s
Continuous Integration / build-production (pull_request) Skipped
Continuous Integration / test (pull_request) Successful in 2m1s
Continuous Integration / build (pull_request) Successful in 2m0s
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 2m57s
Continuous Integration / deploy-production (pull_request) Skipped
Continuous Integration / config (pull_request) Successful in 51s
Continuous Integration / prepare (pull_request) Successful in 1m42s
Continuous Integration / build-production (pull_request) Skipped
Continuous Integration / test (pull_request) Successful in 2m1s
Continuous Integration / build (pull_request) Successful in 2m0s
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 2m57s
Continuous Integration / deploy-production (pull_request) Skipped
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -5,7 +5,7 @@
|
||||
- **Feature Slug**: redesign-modern-timetravel
|
||||
- **Project Type**: Brownfield
|
||||
- **Start Date**: 2026-11-09T13:00:00Z
|
||||
- **Current Stage**: CONSTRUCTION - U5 e-timetravel code complete (awaiting user review on test)
|
||||
- **Current Stage**: COMPLETE for the test environment (2026-11-16). All units built and reviewed by the user on test.slpsoftware.nl; merge to master without a production release. Follow-ups: Hero module (new feature), privacy statement and static-text review (kept aside by the user), joint release moment (production checklist).
|
||||
- **Branch**: feature/redesign-modern-timetravel
|
||||
|
||||
## Workspace State
|
||||
@@ -30,8 +30,8 @@
|
||||
| Property-Based Testing | Partial (pure functions and serialization round-trips only) | Requirements Analysis |
|
||||
|
||||
## Operations Configuration
|
||||
- **Include Operations Phase**: Undecided
|
||||
- **Decided At**: Pending — asked at Requirements Analysis
|
||||
- **Include Operations Phase**: No, as separate stages. Deployment, monitoring and production readiness are covered by one joint release checklist for SLS, ASF and the CMS, executed at the joint release moment (needs the ASF IIS publish pipeline first).
|
||||
- **Decided At**: 2026-11-16 (user)
|
||||
|
||||
## Coordination Notes
|
||||
- **Contact form**: the user wants to be notified BEFORE the form build starts, so other sessions that also need a form and the CMS & API session can be attached to build it together.
|
||||
@@ -53,12 +53,12 @@
|
||||
- [x] Units Generation (approved 2026-11-10)
|
||||
|
||||
### 🟢 CONSTRUCTION PHASE (units U1 theme-foundation, U2 b-modern-sections, U3 packages-block, U4 contact-form, U5 e-timetravel)
|
||||
- [ ] Functional Design (EXECUTE U1, U3, U4; SKIP U2, U5)
|
||||
- [ ] NFR Requirements (EXECUTE U4, U5; SKIP U1-U3)
|
||||
- [ ] NFR Design (EXECUTE U4, U5)
|
||||
- [ ] Infrastructure Design (EXECUTE U4 only)
|
||||
- [ ] Code Generation (EXECUTE, per unit)
|
||||
- [ ] Build and Test (EXECUTE)
|
||||
- [x] Functional Design (EXECUTE U1, U3, U4; SKIP U2, U5)
|
||||
- [x] NFR Requirements (EXECUTE U4, U5; SKIP U1-U3)
|
||||
- [x] NFR Design (EXECUTE U4, U5)
|
||||
- [x] Infrastructure Design (EXECUTE U4 only)
|
||||
- [x] Code Generation (EXECUTE, per unit)
|
||||
- [x] Build and Test (EXECUTE) — CI green on every commit (last: run 116, 7da6d98), user tested form, messages, share image and packages on test (2026-11-16)
|
||||
|
||||
### 🟡 OPERATIONS PHASE
|
||||
- [ ] Deployment Setup, Monitoring Setup, Production Readiness Validation — UNDECIDED (asked at Build and Test)
|
||||
- [x] Deployment Setup, Monitoring Setup, Production Readiness Validation — NOT run as separate stages; covered by the joint release checklist (decided 2026-11-16)
|
||||
|
||||