Status feature afgerond (test), Operations opgenomen in gezamenlijke release-checklist
Continuous Integration / config (pull_request) Successful in 51s
Continuous Integration / prepare (pull_request) Successful in 1m42s
Continuous Integration / build-production (pull_request) Skipped
Continuous Integration / test (pull_request) Successful in 2m1s
Continuous Integration / build (pull_request) Successful in 2m0s
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 2m57s
Continuous Integration / deploy-production (pull_request) Skipped
Continuous Integration / config (pull_request) Successful in 51s
Continuous Integration / prepare (pull_request) Successful in 1m42s
Continuous Integration / build-production (pull_request) Skipped
Continuous Integration / test (pull_request) Successful in 2m1s
Continuous Integration / build (pull_request) Successful in 2m0s
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 2m57s
Continuous Integration / deploy-production (pull_request) Skipped
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,24 @@
|
||||
# Joint release checklist (SLS, ASF, CMS)
|
||||
|
||||
Replaces the separate Deployment Setup, Monitoring Setup and Production Readiness stages of the features that are merged to master on 2026-11-16 (decision of the owner). Executed once, at the joint release moment. Every step needs the explicit go of the owner.
|
||||
|
||||
Status on 2026-11-16: everything is merged to master and runs on TEST only. No production release has been made.
|
||||
|
||||
## Before the release moment
|
||||
- [ ] ASF IIS publish pipeline exists (own feature: self-contained win-x64 publish, FTP upload, web.config, the CMS host as the single entry for the website; open hosting questions are answered by trying it with ASF).
|
||||
- [ ] Hero module feature decided (release with or without it).
|
||||
- [ ] Privacy statement and static texts reviewed by the owner (kept aside until now).
|
||||
- [ ] Captcha provider decided (Gitea issue #14, `docs/captcha-providers.md` in the CMS repo). Captcha stays OFF in production until then.
|
||||
|
||||
## Merge state (done 2026-11-16)
|
||||
- Order: CMS (`contact-forms-module`) first, then ASF (`asf-packages-cms`, test-only commit d449e76 removed), then SLS (`redesign-modern-timetravel`).
|
||||
- A push to master deploys to test only. Production is only started by a manual dispatch (ASF: only from a `release/` branch).
|
||||
- CMS branch protection: required checks `backend-test` and `frontend-test` only.
|
||||
|
||||
## Release steps (production)
|
||||
1. SLP production environment: `Website__NoIndex=false`, `Website__PublicBaseUrl=https://slpsoftware.nl`.
|
||||
2. Contact retention configured (12 months for messages) and checked.
|
||||
3. Deploy CMS (`deploy_sls_production`), then the SLS website (`deploy_production`), then ASF via the IIS pipeline.
|
||||
4. IIS passes ALL requests to the CMS host for ASF.
|
||||
5. After release: check Sentry (errors, release tag), smoke tests per site, share image and sitemap, contact form end to end (one real message), cookies and statistics as described in the privacy statement.
|
||||
6. Update requirements and docs to the production state.
|
||||
@@ -5,7 +5,7 @@
|
||||
- **Feature Slug**: redesign-modern-timetravel
|
||||
- **Project Type**: Brownfield
|
||||
- **Start Date**: 2026-11-09T13:00:00Z
|
||||
- **Current Stage**: CONSTRUCTION - U5 e-timetravel code complete (awaiting user review on test)
|
||||
- **Current Stage**: COMPLETE for the test environment (2026-11-16). All units built and reviewed by the user on test.slpsoftware.nl; merge to master without a production release. Follow-ups: Hero module (new feature), privacy statement and static-text review (kept aside by the user), joint release moment (production checklist).
|
||||
- **Branch**: feature/redesign-modern-timetravel
|
||||
|
||||
## Workspace State
|
||||
@@ -30,8 +30,8 @@
|
||||
| Property-Based Testing | Partial (pure functions and serialization round-trips only) | Requirements Analysis |
|
||||
|
||||
## Operations Configuration
|
||||
- **Include Operations Phase**: Undecided
|
||||
- **Decided At**: Pending — asked at Requirements Analysis
|
||||
- **Include Operations Phase**: No, as separate stages. Deployment, monitoring and production readiness are covered by one joint release checklist for SLS, ASF and the CMS, executed at the joint release moment (needs the ASF IIS publish pipeline first).
|
||||
- **Decided At**: 2026-11-16 (user)
|
||||
|
||||
## Coordination Notes
|
||||
- **Contact form**: the user wants to be notified BEFORE the form build starts, so other sessions that also need a form and the CMS & API session can be attached to build it together.
|
||||
@@ -53,12 +53,12 @@
|
||||
- [x] Units Generation (approved 2026-11-10)
|
||||
|
||||
### 🟢 CONSTRUCTION PHASE (units U1 theme-foundation, U2 b-modern-sections, U3 packages-block, U4 contact-form, U5 e-timetravel)
|
||||
- [ ] Functional Design (EXECUTE U1, U3, U4; SKIP U2, U5)
|
||||
- [ ] NFR Requirements (EXECUTE U4, U5; SKIP U1-U3)
|
||||
- [ ] NFR Design (EXECUTE U4, U5)
|
||||
- [ ] Infrastructure Design (EXECUTE U4 only)
|
||||
- [ ] Code Generation (EXECUTE, per unit)
|
||||
- [ ] Build and Test (EXECUTE)
|
||||
- [x] Functional Design (EXECUTE U1, U3, U4; SKIP U2, U5)
|
||||
- [x] NFR Requirements (EXECUTE U4, U5; SKIP U1-U3)
|
||||
- [x] NFR Design (EXECUTE U4, U5)
|
||||
- [x] Infrastructure Design (EXECUTE U4 only)
|
||||
- [x] Code Generation (EXECUTE, per unit)
|
||||
- [x] Build and Test (EXECUTE) — CI green on every commit (last: run 116, 7da6d98), user tested form, messages, share image and packages on test (2026-11-16)
|
||||
|
||||
### 🟡 OPERATIONS PHASE
|
||||
- [ ] Deployment Setup, Monitoring Setup, Production Readiness Validation — UNDECIDED (asked at Build and Test)
|
||||
- [x] Deployment Setup, Monitoring Setup, Production Readiness Validation — NOT run as separate stages; covered by the joint release checklist (decided 2026-11-16)
|
||||
|
||||
Reference in New Issue
Block a user