diff --git a/aidlc-docs/features/redesign-modern-timetravel/aidlc-state.md b/aidlc-docs/features/redesign-modern-timetravel/aidlc-state.md index fa18d98..c7b17a4 100644 --- a/aidlc-docs/features/redesign-modern-timetravel/aidlc-state.md +++ b/aidlc-docs/features/redesign-modern-timetravel/aidlc-state.md @@ -5,7 +5,7 @@ - **Feature Slug**: redesign-modern-timetravel - **Project Type**: Brownfield - **Start Date**: 2026-11-09T13:00:00Z -- **Current Stage**: CONSTRUCTION - U1 theme-foundation Code Generation (in progress) +- **Current Stage**: CONSTRUCTION - U2 b-modern-sections Code Generation (in progress) - **Branch**: feature/redesign-modern-timetravel ## Workspace State diff --git a/aidlc-docs/features/redesign-modern-timetravel/audit.md b/aidlc-docs/features/redesign-modern-timetravel/audit.md index 7412252..725e0f9 100644 --- a/aidlc-docs/features/redesign-modern-timetravel/audit.md +++ b/aidlc-docs/features/redesign-modern-timetravel/audit.md @@ -514,3 +514,75 @@ **Context**: Leading the builder. Summary file to be read when preparing the frontend handoff (U4). --- + +## U1 Code Generation Complete + +**Timestamp**: 2026-11-10T06:30:00Z + +**User Input**: "Akkoord op jouw bouwplan" + +**AI Response**: "Executed all 13 steps of theme-foundation-code-generation-plan.md. Baseline 6 files / 24 tests; after: 10 files / 56 tests passed, lint 0 errors (2 pre-existing warnings), pnpm build OK, E as separate lazy chunk. Docs commit 1047c73 and code commit made on feature/redesign-modern-timetravel; no push. Prettier run on touched folders reformatted two unrelated files (Footer.tsx, routes/index.tsx), reverted. Summary at construction/theme-foundation/code/summary.md. Completion message presented; awaiting approval." + +**Context**: Code Generation U1 complete (Step 13.5 verified). + +--- + +## Builder CMS-U3b Accepted + +**Timestamp**: 2026-11-10T06:50:00Z + +**User Input**: "(cross-session message from SLS Software - CMS: CMS-U3b openapi-export done, commit 0813656)" + +**AI Response**: "Accepted on the builder's report: committed openapi/slpsoftware.v1.json (no hosts/addresses/secrets), snapshot test with UPDATE_OPENAPI=1 regeneration and drift detection verified by changing one value, contact contract details in the document (reusable Validation/TooLarge/RateLimited, Idempotency-Key header, required fields and maxLength, 404 form closed). Findings: controller without [ApiController] needs ApiExplorerSettings(IgnoreApi=false); class-wide Produces overwrote problem+json (caught by own test, removed). Contact.Tests 117, Core 205, Availability 95, Offerings 86, Identity 37, Master 57, Api 4 passed. Contract status line updated. Builder continues with CMS-U4." + +**Context**: Leading the builder. + +--- + +## Resume After Credits Top-up + +**Timestamp**: 2026-11-10T07:30:00Z + +**User Input**: "Credits zijn aangevuld kan je kijken of de andere sessie of jij iets moeten hervatten" + +**AI Response**: "Checked sessions and worktree. SLS Software - CMS [9d882f] is idle with unfinished CMS-U4 work in its worktree (uncommitted admin API, settings, gates, migration AddContactSettings, tests, plus a stray Scratch.cs); sent a resume instruction (verify state, remove Scratch.cs, finish per plan, report). CMS & API [df4818] is busy with its own work. This session: U1 code committed (0854e3a), waiting for the user's approval before U2; no unfinished work on this side." + +**Context**: Coordination. + +--- + +## Builder CMS-U4 Accepted; Phase 1 Complete + +**Timestamp**: 2026-11-10T08:10:00Z + +**User Input**: "(cross-session message from SLS Software - CMS: CMS-U4 contact-admin-api done, commit 44f161a)" + +**AI Response**: "Accepted on the builder's report: seven AdminOnly routes (list, detail, patch, delete, resend, GET/PUT contact-settings), two-layer gate (host flag first, CMS switch cached 5 s, default off), migration AddContactSettings, OpenAPI snapshot regenerated. Real bug caught by the pipeline test (statuses.Contains query -> 500) fixed. Tests: Contact 223, Core 205, Availability 95, Offerings 86, Identity 37, Master 57, Api 4 passed. Deviation from plan accepted: with the CMS disabled (availability) a verified Owner/Administrator still passes the gate (existing gate design); others get 503. No data lost by the interruption; container removed. CMS phase 1 (U0, U1, U1b, U2, U3, U3b, U4) done; phase 2 (U5 mail+retry, U6 admin UI, U7 availability PUT) waits for Bryan's decision on merging feature/identity-email-notifications. Builder on stand-by; asked for a consolidated phase-1 handoff file." + +**Context**: Leading the builder. Open for Bryan: merge decision of the ASF branch; whether the CMS branch feature/contact-forms-module is pushed for a test deploy. + +--- + +## U1 Approved; U2 Code Generation Plan Ready + +**Timestamp**: 2026-11-10T09:00:00Z + +**User Input**: "Jij kan verder naar u2. De cms moet nog even wachten" + +**AI Response**: "U1 treated as approved (user said to continue to U2); CMS phase 2 stays on hold. U2 (b-modern-sections) skips Functional Design/NFR/Infrastructure per the execution plan because the design exists in the canvas. Read the canvas file Modern.dc.html and created construction/plans/b-modern-sections-code-generation-plan.md (9 steps). Key points: new brand/inv/panel/field/prog/body tokens, Archivo for all text (Sora and Instrument Sans removed), text stays from content.ts with only structural content additions, display headline from the design flagged, mobile menu kept, contact panel shows mailto until U4, packages untouched until U3. Plan approval prompt presented." + +**Context**: Code Generation Part 1 (planning) for U2. + +--- + +## U2 Plan Approved; ASF Branch Merge Authorized + +**Timestamp**: 2026-11-10T09:30:00Z + +**User Input**: "Approve plan. K denk dat de cms sessie ook wel kan mergen. De grootste changes zijn al gedaan en de rest kan wel later worden gemerged vanaf master" + +**AI Response**: "U2 Code Generation plan approved; starting Part 2. Interpreted 'de cms sessie kan mergen' as: the ASF CMS session (AndreaSlopFotografie, owner of feature/identity-email-notifications) may merge that branch into SlpModularCms master; relayed as Bryan's decision, asked it to merge by its normal process, report the merge commit and expected conflicts to this session and to the builder, and to flag any concrete risk first. Builder (SLS Software - CMS) told to wait for the merge message, then rebase feature/contact-forms-module on master (no push), switch ContactRateLimitPartition to ClientPartitionKey if present, run all tests, and send the rebase result plus plans for CMS-U5, U6, U7 for approval. Contact:Enabled stays off; nothing deployed or pushed." + +**Context**: CMS phase 2 unblocked pending the merge; U2 Code Generation starts. + +--- diff --git a/aidlc-docs/features/redesign-modern-timetravel/construction/b-modern-sections/code/summary.md b/aidlc-docs/features/redesign-modern-timetravel/construction/b-modern-sections/code/summary.md new file mode 100644 index 0000000..d0e887f --- /dev/null +++ b/aidlc-docs/features/redesign-modern-timetravel/construction/b-modern-sections/code/summary.md @@ -0,0 +1,28 @@ +# Code Summary — b-modern-sections (U2) + +## What was built (design B, light and dark) +- **Tokens**: seven new semantic tokens in all four variant×mode sets (`brand`, `on-brand`, `body`, `inv`, `panel`, `field`, `prog`) plus Tailwind names; the constant brand red `#7A1414` (E: `#AC0000`) is used for hero, contact and featured elements in both modes, as in the canvas. Archivo Variable is now the face for `sans` and `display`; Sora and Instrument Sans (fonts and npm packages) are removed; JetBrains Mono stays for the code strip. +- **Header/nav** (`Nav.tsx`): brand block, not sticky, white text, white CTA block "Start project", both round toggles in the white `onBrand` tone (`toggleTone.ts`), mobile hamburger menu kept; `