Continuous Integration / deploy-test (pull_request) Canceled after 0s
Continuous Integration / lighthouse (pull_request) Canceled after 0s
Continuous Integration / deploy-production (pull_request) Canceled after 0s
Continuous Integration / check (pull_request) Canceled after 5m57s
Full pnpm check at ae769cb passed and 24 browser checks against the
production build passed. Adds the build and test instructions and
summary, marks the feature complete and logs the session in the audit.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
915 B
915 B
Unit Test Execution — over-mij-page
cd web
pnpm test # vitest run --coverage
- Expected: 60 files, 273 tests, 0 failures (at ae769cb; 53 files / 244 tests before this feature)
- Coverage: thresholds met.
src/lib/andsrc/seo.tsat 100%. The suite overall is 92% of statements. - Includes, new in this feature:
PageSection(renamed) andMediaText, with the homepageAboutBlockoutput unchanged- the page components (
AboutIntro,StorySection,RichParagraph,PhotoDuo), axe-checked - the
/over-mijroute through the real route tree: heading outline, section names, link and button targets, head tags - property-based tests (fast-check) for
person,aboutPage,professionalServiceandknowsAboutList: two-way@idlinks,sameAsonly valid https socials, no e-mail address, idempotency
- Report: terminal output plus
web/coverage/