# AI-DLC State Tracking ## Project Information - **Feature Name**: Hero as a manageable CMS module (ASF side) - **Feature Slug**: hero-module - **Project Type**: Brownfield (cross-repo: SMC builds the module and the host injection of the hero; this repo consumes it, supplies markers, contract and golden files) - **Start Date**: 2026-11-16 - **Current Stage**: COMPLETE on the ASF side (closed 2026-11-17); branch feature/hero-module, to be merged to master by SLS-Main. No production deploy. ## Language Configuration - **Documentation Language**: English - **Conversation Language**: User Language (Dutch) ## Stage Progress - [x] INCEPTION - requirements and contract agreed with SMC (`web/contract/host-injection/hero/README.md`, model B: wide 3:2 and tall 4:5 variants, ``, preload per orientation) - [x] CONSTRUCTION - Code Generation: markers HERO-HTML and HERO-PRELOAD, `hero` key in `#cms-data`, `useHero` with baked fallback, plain-HTML first photo that survives hydration, slider on top, hero texts in `nl.json`, stand-in host and preview server, e2e tests, docs - [x] CONSTRUCTION - Build and Test: [build-and-test-summary.md](construction/build-and-test/build-and-test-summary.md) - [x] OPERATIONS - part of the joint production checklist ([docs/go-live-checklist.md](../../../docs/go-live-checklist.md), section "Hero"); production follows via the IIS pipeline, later ## Scope decisions - **Planning (from/to dates) and a hero-wide on/off switch are deliberately not built.** The hero is always there; a hero without usable slides leaves the baked hero in place (for ASF the host setting `Hero:TextOnlyRegion` is off). Adding them later is a CMS change plus a `204`, which the site already handles. - The ASF test seed holds the 8 existing hero photos with focus estimates (`web/contract/host-injection/hero/seed.json`); Bryan runs the seed himself (admin password). ## Assumptions [assumptions-and-open-questions.md](assumptions-and-open-questions.md): what Bryan has to check later.