Opens the contact form through a build switch instead of the TEST ONLY commit; closes the AI-DLC records
Continuous Integration / check (pull_request) Successful in 2m25s
Continuous Integration / build-test (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 9m2s
Continuous Integration / deploy-production (pull_request) Skipped

The form is closed unless the build sets VITE_CONTACT_FORM_ENABLED=true (only
the test build does), so d449e76 no longer has to be undone before the merge.
Status files of contact-form-cms, asf-packages-cms, asf-cms-host-injection and
asf-translation-files are closed; Build and Test summary added.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-16 12:01:29 +01:00
co-authored by Claude Sonnet 5.5
parent e7bae5edd7
commit db86332c1f
19 changed files with 209 additions and 45 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: contact-form-cms
- **Project Type**: Brownfield
- **Start Date**: 2026-11-10T21:42:54Z
- **Current Stage**: OPERATIONS - documents written, awaiting approval
- **Current Stage**: COMPLETE (closed 2026-11-16, Bryan's go via SLP Software - SLS - Main); Operations = included in the joint production checklist (docs/go-live-checklist.md), no separate steps; the form stays closed in production until Bryan's explicit go. Merges with feature/asf-packages-cms (PR), after the CMS PR.
- **Branch**: feature/contact-form-cms (from master 7d594ff)
- **Worktree**: K:\Development\SlpSoftware\Projects\AndreaSlopFotografie-contact-form
@@ -52,4 +52,4 @@
- [x] CONSTRUCTION - Infrastructure Design: EXECUTE (approved; CSP set by Bryan: exact frame hosts)
- [x] CONSTRUCTION - Code Generation: EXECUTE (plan approved; steps 1-13 done)
- [x] CONSTRUCTION - Build and Test: EXECUTE (summary written; awaiting approval)
- [x] OPERATIONS - deployment plan, monitoring plan, production readiness checklist written (go-live conditions open)
- [x] OPERATIONS - included in the joint production checklist (docs/go-live-checklist.md); the rebuild-trigger question lapses (NFR-10); go-live conditions stay open there