Opens the contact form through a build switch instead of the TEST ONLY commit; closes the AI-DLC records
Continuous Integration / check (pull_request) Successful in 2m25s
Continuous Integration / build-test (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 9m2s
Continuous Integration / deploy-production (pull_request) Skipped

The form is closed unless the build sets VITE_CONTACT_FORM_ENABLED=true (only
the test build does), so d449e76 no longer has to be undone before the merge.
Status files of contact-form-cms, asf-packages-cms, asf-cms-host-injection and
asf-translation-files are closed; Build and Test summary added.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-16 12:01:29 +01:00
co-authored by Claude Sonnet 5.5
parent e7bae5edd7
commit db86332c1f
19 changed files with 209 additions and 45 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: contact-form-cms
- **Project Type**: Brownfield
- **Start Date**: 2026-11-10T21:42:54Z
- **Current Stage**: OPERATIONS - documents written, awaiting approval
- **Current Stage**: COMPLETE (closed 2026-11-16, Bryan's go via SLP Software - SLS - Main); Operations = included in the joint production checklist (docs/go-live-checklist.md), no separate steps; the form stays closed in production until Bryan's explicit go. Merges with feature/asf-packages-cms (PR), after the CMS PR.
- **Branch**: feature/contact-form-cms (from master 7d594ff)
- **Worktree**: K:\Development\SlpSoftware\Projects\AndreaSlopFotografie-contact-form
@@ -52,4 +52,4 @@
- [x] CONSTRUCTION - Infrastructure Design: EXECUTE (approved; CSP set by Bryan: exact frame hosts)
- [x] CONSTRUCTION - Code Generation: EXECUTE (plan approved; steps 1-13 done)
- [x] CONSTRUCTION - Build and Test: EXECUTE (summary written; awaiting approval)
- [x] OPERATIONS - deployment plan, monitoring plan, production readiness checklist written (go-live conditions open)
- [x] OPERATIONS - included in the joint production checklist (docs/go-live-checklist.md); the rebuild-trigger question lapses (NFR-10); go-live conditions stay open there
@@ -1,6 +1,6 @@
# Production readiness checklist: contact-form-cms
Status: web side ready for a test deploy; NOT ready for production (go-live conditions open). The form stays off in production (`siteContent.contactForm.enabled = false`) until Bryan gives an explicit go.
Status (2026-11-16): web side closed and merged with feature/asf-packages-cms; this checklist is part of the joint production checklist (docs/go-live-checklist.md). NOT ready for production (go-live conditions open). The form is closed in production: it opens only when the build sets `VITE_CONTACT_FORM_ENABLED=true` (only the test build does), and that needs Bryan's explicit go.
## Done (web)
- [x] Form on the headless `cms-client` package, no forked logic; import boundary enforced
@@ -20,10 +20,10 @@ Status: web side ready for a test deploy; NOT ready for production (go-live cond
- [ ] A real mail from the production host checked (SPF/DKIM, "toon origineel") and the message visible in the ASF CMS.
- [ ] Test of the form on the deployed ASF test host with the real server (after the CMS branch is merged and deployed).
- [ ] ASF production hosting (IIS) in place (separate feature).
- [ ] Bryan's explicit go, then `siteContent.contactForm.enabled = true` in its own reviewed change.
- [ ] Bryan's explicit go, then the production build gets `VITE_CONTACT_FORM_ENABLED=true` in its own reviewed change.
## Rollback
`enabled = false` and redeploy, or `Contact:Enabled` off on the server (404 keeps the gate).
unset `VITE_CONTACT_FORM_ENABLED` and redeploy, or `Contact:Enabled` off on the server (404 keeps the gate).
## Risks and notes
- Free captcha tier must not be used commercially.