Opens the contact form through a build switch instead of the TEST ONLY commit; closes the AI-DLC records
Continuous Integration / check (pull_request) Successful in 2m25s
Continuous Integration / build-test (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 9m2s
Continuous Integration / deploy-production (pull_request) Skipped
Continuous Integration / check (pull_request) Successful in 2m25s
Continuous Integration / build-test (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 9m2s
Continuous Integration / deploy-production (pull_request) Skipped
The form is closed unless the build sets VITE_CONTACT_FORM_ENABLED=true (only
the test build does), so d449e76 no longer has to be undone before the merge.
Status files of contact-form-cms, asf-packages-cms, asf-cms-host-injection and
asf-translation-files are closed; Build and Test summary added.
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -155,6 +155,10 @@ jobs:
|
||||
# deze testbuild; het productie-artefact (job check) krijgt de
|
||||
# variabele niet en houdt https://andreaslop.nl.
|
||||
VITE_SITE_URL: https://test.andreaslop.nl
|
||||
# Het contactformulier staat alleen in deze testbuild open; standaard
|
||||
# (en in het productie-artefact) is het dicht. Productie aanzetten
|
||||
# vraagt Bryans expliciete go (docs/go-live-checklist.md).
|
||||
VITE_CONTACT_FORM_ENABLED: 'true'
|
||||
|
||||
- name: Upload build artifact (test)
|
||||
uses: actions/upload-artifact@v3
|
||||
|
||||
Reference in New Issue
Block a user