Marks the Contact page as complete
Continuous Integration / check (pull_request) Successful in 11m41s
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 12m53s
Continuous Integration / deploy-production (pull_request) Skipped

PR #9 is merged; records the merge, the clean-up and the final status.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-25 20:44:22 +01:00
co-authored by Claude Opus 5.5
parent 8b70f239aa
commit a731447dac
3 changed files with 26 additions and 2 deletions
@@ -5,7 +5,7 @@
- **Feature Slug**: contact-page
- **Project Type**: Brownfield
- **Start Date**: 2026-10-24T19:35:48Z
- **Current Stage**: CONSTRUCTION - Build and Test complete; PR to master
- **Current Stage**: Complete (merged to master in PR #9, 8b70f23)
- **Branch**: feature/contact-page (rebased onto master 11a5224 after over-mij-page merge)
## Workspace State
+24
View File
@@ -860,3 +860,27 @@ Features "portfolio-page" and "soorten-fotoshoots-page" are also active and stac
**Context**: CONSTRUCTION - Build and Test (complete)
---
## Pull Request
**Timestamp**: 2026-10-25T23:20:00Z
**User Input**: (continuation — "Daarna mag je committen, pushen en PR maken.")
**AI Response**: "Committed 1afa7d9 (submit button right, scroll reset fix) and 65c007f (Build and Test docs), pushed. Opened PR #9 feature/contact-page → master. Watching for the merge; after it: release the test claim, clean up the worktree and branch, update master, mark the feature complete, update the memory note (D6), and update the Portfolio session."
**Context**: CONSTRUCTION - Build and Test complete; PR #9 open
---
## Merge and Clean-up
**Timestamp**: 2026-10-26T00:10:00Z
**User Input**: (continuation of "Zodra die PR gemerged is mag je opruimen en updaten en kan je de portfolio-sessie een update geven.")
**AI Response**: "PR #9 merged as 8b70f23 (remote branch deleted by the merge; the merge also deployed master to test). Saved the uncommitted audit entry as a patch, removed the contact worktree and folder and the local branch feature/contact-page (fully merged), fast-forwarded master in the main checkout to 8b70f23. Marked the feature complete (aidlc-state, active-features) on a local branch docs/contact-page-complete, since the feature branch was already merged. Released the test claim and updated Portfolio-pagina. Memory: removed the D6 follow-up (now on master)."
**Context**: Feature complete
---