Hero module: closing docs (state, build and test summary, assumptions, go-live checklist)
Continuous Integration / check (pull_request) Successful in 2m20s
Continuous Integration / build-test (pull_request) Skipped
Continuous Integration / deploy-test (pull_request) Skipped
Continuous Integration / lighthouse (pull_request) Successful in 8m55s
Continuous Integration / deploy-production (pull_request) Skipped

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-11-17 09:25:45 +01:00
co-authored by Claude Sonnet 5.5
parent cce4a2b858
commit 358fca0855
5 changed files with 83 additions and 14 deletions
@@ -0,0 +1,30 @@
# AI-DLC State Tracking
## Project Information
- **Feature Name**: Hero as a manageable CMS module (ASF side)
- **Feature Slug**: hero-module
- **Project Type**: Brownfield (cross-repo: SMC builds the module and the host injection of the hero; this repo consumes it, supplies markers, contract and golden files)
- **Start Date**: 2026-11-16
- **Current Stage**: COMPLETE on the ASF side (closed 2026-11-17); branch feature/hero-module, to be merged to master by SLS-Main. No production deploy.
## Language Configuration
- **Documentation Language**: English
- **Conversation Language**: User Language (Dutch)
## Stage Progress
- [x] INCEPTION - requirements and contract agreed with SMC (`web/contract/host-injection/hero/README.md`, model B: wide 3:2 and tall 4:5 variants, `<picture>`, preload per orientation)
- [x] CONSTRUCTION - Code Generation: markers HERO-HTML and HERO-PRELOAD, `hero` key in `#cms-data`, `useHero` with baked fallback, plain-HTML first photo that survives hydration, slider on top, hero texts in `nl.json`, stand-in host and preview server, e2e tests, docs
- [x] CONSTRUCTION - Build and Test: [build-and-test-summary.md](construction/build-and-test/build-and-test-summary.md)
- [x] OPERATIONS - part of the joint production checklist ([docs/go-live-checklist.md](../../../docs/go-live-checklist.md), section "Hero"); production follows via the IIS pipeline, later
## Scope decisions
- **Planning (from/to dates) and a hero-wide on/off switch are deliberately not built.** The hero is always there; a hero without usable slides leaves the baked hero in place (for ASF the host setting `Hero:TextOnlyRegion` is off). Adding them later is a CMS change plus a `204`, which the site already handles.
- The ASF test seed holds the 8 existing hero photos with focus estimates (`web/contract/host-injection/hero/seed.json`); Bryan runs the seed himself (admin password).
## Assumptions
[assumptions-and-open-questions.md](assumptions-and-open-questions.md): what Bryan has to check later.